305 West 98th Street, Manhattan
Co-op · 88 units · built c. 1930 · Block 1888, Lot 10.
Building permits
- Alteration, filed Feb 12, 2026, estimated cost $25K, described as “Kitchen, bathroom and one bedroom interior renovation of apt. #5F. No change of use, egress or occupancy.”
- Alteration, filed Feb 12, 2026, estimated cost $19K, described as “General construction interior renovation of existing apartment #7CS on the 7TH floor. As per plans filed. No change to zoning, use, egress, or occupancy.”
- Alteration, filed Jan 27, 2026, estimated cost $15K, described as “Installation of temporary winterized enclosure during parapet replacement as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 24, 2025, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 11, 2025, estimated cost $107K, described as “Gutt renovation of apartment 5AN. Minor partition and plumbing alteration. No change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2025, estimated cost $114K, described as “Unit 7DS limited interior renov. Incl new & relocation of non-load bearing interior partitions, fixture replacements, new appliances, flooring & finishes as per plans. Assoc pl work filed later by others. No change in use, egress or…”
- Alteration, filed Aug 8, 2024, described as “Installation of suspended scaffold during facade inspection / repairs.”
- Alteration, filed Aug 8, 2024, described as “Installation of suspended scaffold during facade inspection / repairs.”
- Alteration, filed Nov 21, 2023, estimated cost $24K, described as “Renovations to Class A apartmetn 8BS on the 7th floor as per plans filed herwith. No change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2023, estimated cost $238K, described as “Replace gas boilers”
- Alteration, filed Sep 6, 2023, estimated cost $19K, described as “Hereby filing removal of existing window sill to accomodate new door opening as per plans.”
- Alteration, filed Aug 25, 2023, estimated cost $20K, described as “Installation of tmeporary sidewalk shed an supported scaffold as shown on plans”
- Alteration, filed May 24, 2023, estimated cost $225K, described as “Local law 11 /98”
- Alteration, filed Jan 18, 2023, estimated cost $590K, described as “Roof replacement as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Oct 31, 2022, estimated cost $29K, described as “Installation of temporary sidewalk shed and supported scaffold as shown on plans”
- Alteration, filed Oct 27, 2022, estimated cost $63K, described as “Interior renovation of existing 5TH floor apartment (apt. 5EN). Work includes minor modification to existing partition, replacement of the existing kitchen cabinets, replacement of plumbing fixtures at existing roughing. No change to use,…”
- Alteration, filed Nov 23, 2021, estimated cost $15K, described as “Erect interior non-loading bearing partition to create a bedroom. No changes to use, egress or occupancy.”
- Alteration, filed Nov 20, 2020, estimated cost $20K, described as “Install sidewalk shed and supported scaffold, as shown on drawings. No change in use, egres or occupancy.”
- Alteration, filed Nov 19, 2020, estimated cost $18K, described as “Replacement of existing plumbing fixtures with new on existing roughings at 4th floor apt. no. 4CN.”
- Alteration, filed Nov 8, 2017, estimated cost $4K, described as “Installation of sidewalk shed as per plans. Work shall comply with 2014 building code chapter 33. No change in use, egress or occupancy.”
Building history
- Major Renovation — Conversion, filed Jul 15, 1996, signed off Oct 24, 2002, 43 units added, 8 stories, described as “Combine two apartments, 6E and 6F. Minor demolition, new partitions. Amended certificate of occupancy require d.”
- Major Renovation — Conversion, filed May 21, 1991, permit issued - partial job, 45 units added, 7 stories, described as “Combining two apts. Into one as shown on drawings.all work was filed under separate application,BIS#100252600 for apts. 6D & 6E only.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $8,826,300
- 2026–27 Tax
- $788,077
- Market value (city estimate)
- $19,614,000
- Taxable value
- $7,499,903
- Assessed land
- $1,170,000
- Assessed improvements
- $7,656,300
Tax breaks
- Co-op and Condo Abatement, with no end date, a $144,894 credit this tax year.
Zoning
R8B: floor area ratio 4.89 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 29, 2026: $625,000
- Aug 17, 2026: $930,000
- Aug 11, 2026: $1,140,000
- Jul 30, 2026: $1,249,000
- Jun 18, 2026: $1,650,000
- Jun 17, 2026: $1,150,000
- Jul 22, 2025: $615,000
- Jun 4, 2025: $1,250,000
- May 27, 2025: $1,220,000
- Jan 15, 2025: $1,415,000
The 10 most recent of 36 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Riverside-West End Historic District Extension II (Historic District). 33 Landmarks Preservation Commission permits are on file.