789 West End Avenue, Manhattan
Co-op · 65 units · built c. 1916 · Block 1888, Lot 25.
Building permits
- Alteration, filed Sep 28, 2026, estimated cost $250K, described as “Scope of work herewith file plans to renovate apartment 10C, general construction to include limited removal & construction of non-structural partitions, new lighting, throughout, replacement of appliances &plumbing. No change to use,…”
- Alteration, filed Nov 5, 2025, estimated cost $237K, described as “Interior renovation and combination of existing coop apts. #2A and #2B in compliance with TPPN 3/97. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use,…”
- Alteration, filed Dec 21, 2023, described as “Renewal for Facade Work”
- Alteration, filed Jun 21, 2023, estimated cost $85K, described as “Facade repairs from floors 1-14 as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Feb 16, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the NYC code 2022. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 14, 2022, estimated cost $80K, described as “Herewith file sprinkler plans, filed in conjunction with GC,MS and PL work.”
- Alteration, filed Jul 13, 2022, estimated cost $53K, described as “Herewith file mechanical plans for the basement and 1st floor, filed in conjunction with GC #M00609749”
- Alteration, filed Jul 13, 2022, estimated cost $35K, described as “Herewith file plumbing plans, filed in conjunction with GC, MS, SP work types.”
- Alteration, filed Jul 11, 2022, estimated cost $389K, described as “Herewith file plans for a tenant accessory exercise room in the basement (per approved CCD1 #68325), work is general construction. MS,PL, SP filed under separate applications.”
- Alteration, filed Nov 30, 2021, estimated cost $7K, described as “Create new fuel storage tank vault as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 30, 2021, estimated cost $80K, described as “Replace existing 5,000 gallon fuel storage tank with 3,000 gallon fuel storage tank. No change in use, egress or occupancy.”
- Alteration, filed Jul 1, 2020, estimated cost $25K, described as “Mechanical work related to the renovation of apartment 6C on the 6th floor. No change to use, egress or occupancy.”
- Alteration, filed Jun 17, 2020, estimated cost $54K, described as “Plumbing work related to the renovation of apartment 6C on the 6th floor. No change to use, egress or occupancy.”
- Alteration, filed Feb 7, 2020, estimated cost $13K, described as “Renovation of existing residential apartment on 9TH floor. Plumbing work. No change in use, occupancy, or egress. Architectural work filed separately through bis system (123700557).”
Property taxes
- Assessment
- $7,818,300
- 2026–27 Tax
- $731,435
- Market value (city estimate)
- $17,374,000
- Taxable value
- $6,886,449
- Assessed land
- $720,000
- Assessed improvements
- $7,098,300
Tax breaks
- Co-op and Condo Abatement, with no end date, a $126,113 credit this tax year.
Zoning
R8: floor area ratio 9.80 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 24, 2026: $2,725,000
- Jun 16, 2026: $1,146,000
- Jun 2, 2026: $1,470,000
- Jan 27, 2026: $995,000
- Nov 19, 2025: $650,000
- Sep 25, 2025: $1,600,000
- Sep 25, 2025: $50,000
- Jun 19, 2024: $1,300,000
- Nov 15, 2023: $2,825,000
- May 24, 2023: $1,340,000
The 10 most recent of 19 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Riverside-West End Historic District Extension II (Historic District). 20 Landmarks Preservation Commission permits are on file.