# 839 West End Avenue, Manhattan

Co-op · 43 units · built c. 1902 · Block 1889, Lot 22.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1018890022/839-west-end-avenue

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1889: https://umarelli.org/nyc/manhattan/1889.md

## Building permits

- Alteration, filed Jul 24, 2026, estimated cost $80K, described as “Structural work for elevator pit repair as per the plans filed herewith. No change to use, egress or occupancy of the building.”
- Alteration, filed Jun 24, 2026, estimated cost $83K, described as “Interior renovation of Apt 5B on the 5th floor including relocating partitions, new sheetrock, cabinets, flooring, etc. No change in use, egress or occupancy.”
- Alteration, filed May 19, 2025, estimated cost $6K, described as “Remove, replace and install plumbing fixtures as per plans submitted herewith.”
- Alteration, filed May 19, 2025, estimated cost $150K, described as “The combination of apts 3A & 3B. The interior renovation of apartment 3A to include selective demolition of non-structural partitions, new partitions and modifications to lighting fixtures and lighting controls. No change in use,egress or…”
- Alteration, filed Mar 7, 2024, described as “Filing for facade repair work (1ST floor to roof) no change to use, egress, or occupancy.”
- Alteration, filed Aug 30, 2023, estimated cost $16K, described as “Proposed direct replacement 1 ex. Sink, 2 ex. W-closets, 2 ex. Lavatories & 1 ex. Dishwasher with new at exist. Roughing & no ex. Plumbing modification to be done in apt. 5D. Proposed relocate 1 exist. Washer. Proposed convert 1 ex.…”
- Alteration, filed Aug 18, 2023, estimated cost $54K, described as “Proposed existing interior renovation and repair in apt. 5D. Replace existing flooring with new. Existing sub-flooring untouched. No change in use, egress or occupancy.”
- Alteration, filed Mar 17, 2022, estimated cost $822K, described as “Filing for facade repair work (1st floor to Roof) no change to use, egress, or occupancy”
- Alteration, filed Apr 22, 2021, estimated cost $13K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Dec 5, 2019, estimated cost $20K, described as “Remove , relocate and install new plumbing fixtures in apartment 3B on the 3RD floor all as per plans. No change in use egress or occupancy under this application. (general construction filed and permitted under application #123885965)”
- Alteration, filed Jun 5, 2018, estimated cost $12K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code”

## Property taxes

- Assessment: $3,452,400
- 2026–27 Tax: $349,463
- Market value (city estimate): $7,672,000
- Taxable value: $3,097,620
- Assessed land: $405,000
- Assessed improvements: $3,047,400

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $35,355 credit this tax year.

## Zoning

R8: floor area ratio 5.74 built, 6.02 allowed by base zoning.

## Recent sales

- Mar 19, 2026: $1,335,000
- Aug 27, 2025: $25,000
- Nov 6, 2024: $935,000
- Oct 28, 2024: $1,220,000
- Jun 18, 2024: $935,000
- May 8, 2024: $1,674,000
- Oct 28, 2022: $1,630,000
- Oct 6, 2022: $9,528,590
- Sep 28, 2022: $999,000
- Jun 16, 2022: $1,750,000

The 10 most recent of 16 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Riverside-West End Historic District Extension II (Historic District). 19 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
