325 Riverside Drive, Manhattan
Co-op · 53 units · built c. 1921 · Block 1891, Lot 35.
Building permits
- Alteration, filed Dec 23, 2025, estimated cost $240K, described as “Replace gas riser #4 for building's domestic gas usage of apartments on line 4.”
- Alteration, filed Sep 11, 2025, estimated cost $178K, described as “Proposed minor demolition within dwelling unit and proposed alterations to Unit # 122 on the 12th floor. New bedroom, walls, doors, kitchen layout and finishes. No change to Use, Egress or Occupancy under this application.”
- Alteration, filed Dec 18, 2023, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 18, 2023, estimated cost $3K, described as “Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 18, 2023, described as “Facade restoration/inspection”
- Alteration, filed Sep 19, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 3, 2022, estimated cost $34K, described as “Interior renovation as shown on plans filed herewith.”
- Alteration, filed Mar 3, 2022, estimated cost $16K, described as “Installation and replacement of plumbing fixtures as shown on plans filed herewith.”
- Alteration, filed Jul 7, 2021, estimated cost $12K, described as “Pumbing work on the 6TH floor in apartment 63 as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jul 6, 2021, estimated cost $110K, described as “Interior renovation on the 6TH floor in apartment 63 as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 4, 2021, estimated cost $50K, described as “1. Cut, remove and cap existing gas piping to apartment's riser #1. 2. Remove existing individual apartment's meters. 3. Install new twin set meter for apartment's risers. 4. Install new gas meter for RISER#1. 5. Connect existing stoves to…”
- Alteration, filed Nov 30, 2020, estimated cost $12K, described as “Mechanical work as per dwgs filed herewith. No change in use, egress and occupancy.”
- Alteration, filed Nov 30, 2020, estimated cost $14K, described as “Plumbing work as per plans filed herewith, no change in use, egress and occupancy.”
Property taxes
- Assessment
- $5,743,350
- 2026–27 tax
- $548,356
- Market value (city estimate)
- $12,763,000
- Taxable value
- $5,053,130
- Assessed land
- $585,000
- Assessed improvements
- $5,158,350
Tax breaks
- Co-op and condo abatement, with no end date, a $80,417 credit this tax year.
Zoning
R8: floor area ratio 9.36 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 13, 2025: $1,540,000
- May 30, 2024: $1,200,000
- Nov 14, 2023: $1,458,600
- Oct 11, 2023: $1,221,900
- Feb 23, 2022: $1,750,000
- Feb 10, 2022: $1,460,000
- Dec 20, 2021: $1,825,000
- Nov 18, 2021: $1,900,000
- Nov 4, 2021: $1,300,000
- Nov 4, 2021: $1,195,000
The 10 most recent of 17 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Riverside-West End Historic District Extension II (Historic District). 14 Landmarks Preservation Commission permits are on file.