315 West 106th Street, Manhattan
Co-op · 52 units · built c. 1925 · Block 1892, Lot 6.
Building permits
- Alteration, filed Jul 9, 2026, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed”
- Alteration, filed Jul 2, 2026, described as “Installation of temporary suspended scaffold equipment for facade inspections and repairs.”
- Alteration, filed Jun 3, 2026, estimated cost $151K, described as “Facade repairs. No change in use, egress or occupancy.”
- Alteration, filed Apr 29, 2026, estimated cost $105K, described as “Interior renovation to apartment 16B. Work to include modifications to interior non-bearing partitions, plumbing modifications as indicated on plans filed herewith and new interior finishes. No change to use, occupancy or egress.”
- Alteration, filed Jan 13, 2026, estimated cost $60K, described as “Minor interior renovation at apt 10B including partitions, cabinets, fixtures and finishes. No change to building occupancy, egress or floor area.”
- Alteration, filed Jul 25, 2024, described as “Suspended scaffold system for AC sleeves caulking on 9th floor”
- Alteration, filed Jan 22, 2024, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Dec 2, 2021, estimated cost $51K, described as “Renovation of an existing apartment#5Bon the fifth floor. work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Feb 18, 2021, estimated cost $200K, described as “General construction related to gas infrastructure repairs, restoration, and relocation of cooking gas meter.”
- Alteration, filed Feb 18, 2021, estimated cost $18K, described as “Revised scope of work: installation of 3 new thru-wall masonry sleeves for 3 new ptac units. No change to use, egress or occupancy.”
- Alteration, filed Feb 18, 2021, estimated cost $250K, described as “Gas infrastructure repairs, restoration, and relocation of cooking gas meter assocated with laa# M00442252. No change in egress or occupancy.”
- Alteration, filed Aug 21, 2020, estimated cost $23K, described as “Installation of a PTAC unit, 2 A/C units and 2 thru wall condensers”
- Alteration, filed Aug 19, 2020, estimated cost $21K, described as “Relocate 2 toilets, 1 lav.,1 tub/shower, 1 clothes washer”
- Alteration, filed Jun 22, 2020, estimated cost $9K, described as “Installation of mechanical system during apartment renovation. No change in use, occupancy, egress”
- Alteration, filed Mar 5, 2020, estimated cost $20K, described as “Interior renovation of apartment 6B, with new plumbing fixtures to be installed, existing fixtures to be replaced, relocated and (2) fixtures to be removed and capped.no change in use, egress or occupancy”
- Alteration, filed Jul 26, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $6,854,400
- 2026–27 Tax
- $669,184
- Market value (city estimate)
- $15,232,000
- Taxable value
- $6,454,317
- Assessed land
- $630,000
- Assessed improvements
- $6,224,400
Tax breaks
- Co-op and condo abatement, with no end date, a $134,368 credit this tax year.
Zoning
R8B: floor area ratio 10.25 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 16, 2026: $2,300,000
- Nov 13, 2025: $2,700,000
- Jan 10, 2025: $3,035,000
- Aug 3, 2022: $2,900,000
- Jul 15, 2022: $1,525,000
- Apr 28, 2022: $2,900,000
- Jan 19, 2022: $2,830,000
- Oct 14, 2021: $2,780,000
- Jun 5, 2019: $3,075,115
- May 13, 2019: $2,425,000
The 10 most recent of 13 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Riverside-West End Historic District Extension II (Historic District). 29 Landmarks Preservation Commission permits are on file.