# 300 West 138th Street, Manhattan

Condominium · 28 units · built 1994 · Block 2041, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1020417502/300-west-138-street

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 2041: https://umarelli.org/nyc/manhattan/2041.md

## Building permits

- Alteration, filed Dec 9, 2022, estimated cost $25K, described as “Hereby filing for the interior renovation of first floor bathroom and kitchen (replacement of plumbing fixtures). No change in use, egress or occupancy.”
- Alteration, filed Dec 9, 2022, estimated cost $50K, described as “Hereby filing for the interior renovation of first floor bathroom and kitchen. No change in use, egress or occupancy.”
- Alteration, filed Sep 9, 2022, estimated cost $27K, described as “Interior renovations at unit d on the third & fourth floors. Interior renovations to include the relocation of existing plumbing fixtures and proposed new fixtures. No change to egress, use or occupancy.”
- Alteration, filed Aug 10, 2022, estimated cost $99K, described as “Interior alterations to existing two family dwelling at unit d, third & fourth floors: alterations to include the removal and replacement of exist. Non-load bearing partition, finishes. No change to use, egress or occupancy.”
- Alteration, filed Sep 8, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chatper 33 of nycc.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 8, 2021, described as “Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Jul 8, 2021, estimated cost $5K, described as “Installation of pipe scaffolding front elevation”
- Alteration, filed Jul 8, 2021, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Livel load 300 per square feet. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 12, 2021, estimated cost $127K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck to remain)”
- Alteration, filed Apr 12, 2021, estimated cost $127K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck top remain)”
- Alteration, filed Apr 12, 2021, estimated cost $80K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the main roof (roof deck to remain), install chain link fence at roof”
- Alteration, filed Apr 12, 2021, estimated cost $127K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the main roof. (roof deck to remain)”
- Alteration, filed Apr 12, 2021, estimated cost $80K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace the roof (roof deck to remain)”
- Alteration, filed Apr 12, 2021, estimated cost $80K, described as “Repair/replace facade as necessary to include masonry, pointing, lintels, sills, caulking, replace main roof (roof deck to remain)”
- Alteration, filed Apr 12, 2021, estimated cost $127K, described as “Repair/replace facade to include masonry, pointing, lintels, sills, caulking. Replace main roof (roof deck to remain)”

## Property taxes

- Assessment: $2,373,307
- 2026–27 Tax: $233,345
- Market value (city estimate): $5,273,999
- Taxable value: $2,209,345
- Assessed land: $270,001
- Assessed improvements: $2,103,306
- Condo units with their own tax lots: 28

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $41,121 credit this tax year.

## Zoning

R7-2: floor area ratio 1.81 built, 3.44 allowed by base zoning.

## Recent sales

- Dec 19, 2025: $715,000, Apt 2573D
- Nov 7, 2024: $260,956, Apt 300C
- Apr 24, 2023: $937,000, Apt 2577B
- Aug 9, 2022: $995,000, Apt 300B
- Apr 14, 2022: $774,000, Apt 2577D
- Apr 7, 2022: $700,000, Apt 2573A
- Dec 8, 2021: $917,500, Apt 2571C
- Feb 12, 2021: $842,500, Apt 2577A
- Nov 24, 2020: $900,000, Apt 300C
- Jul 16, 2020: $765,000, Apt 2579B

The 10 most recent of 13 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
