# 380 Convent Avenue, Manhattan

Utility · Block 2061, Lot 14.

On Umarelli: https://umarelli.org/nyc/1020610014/380-convent-avenue

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 2061: https://umarelli.org/nyc/manhattan/2061.md

## Building permits

- Alteration, filed Oct 22, 2024, estimated cost $1.4M, described as “Herewith filling Roof Replacement”
- Alteration, filed Jun 21, 2024, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 8, 2024, estimated cost $95K, described as “Modification to existing Verizon site. Replace 6 antennas, 8 RRH units, and 3 OVPs. Relocate 4 GPS units, and install a new platform with 3 cabinets. Ladders & railings as per FDNY approval.”
- Alteration, filed Feb 21, 2023, estimated cost $269K, described as “Removal of walls, ductwork, light fixtures damaged from fire, To be replaced with new installation of fire rated partition, ductwork & light fixtures.”
- Alteration, filed Feb 20, 2023, estimated cost $37K, described as “Removal of ductwork damaged from fire, to be replaced with new, installation of New Ductwork”
- Alteration, filed Feb 16, 2023, estimated cost $6K, described as “Installation of temporary system scaffold as per drawings. System scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 25, 2022, estimated cost $1.0M, described as “Proposed general construction and mechanical work .No change of occupancy, use, or egress.”
- Alteration, filed May 6, 2022, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Mar 21, 2022, estimated cost $429K, described as “Facade restoration including faebrick/parapet replacement, windows sill and lintel replacement and stone patching as perplans submitted herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 30, 2020, estimated cost $328K, described as “Replacement of HVAC Units and associated ducts and piping on Second Floor. New Dry cooler on 1st Floor Roof”

## Zoning

R7A (part of the lot is R6A): floor area ratio 0.00 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology