750 Riverside Drive, Manhattan
Condominium · 42 units · built c. 1920 · Block 2099, Lot 7501.
Building permits
- Alteration, filed Aug 2, 2025, described as “Outrigger for facade repair.”
- Alteration, filed Jul 14, 2025, estimated cost $23K, described as “Proposed of brick replacement, window sill, window lintel, stucco repair and re-point mortar to be done as needed as per plans. No change in use occupancy or egress under this application”
- Alteration, filed Jul 8, 2025, estimated cost $9K, described as “Installation of 300PSF sidewalk shed as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 8, 2023, estimated cost $5K, described as “Structural repairs at apartment 5G's bathroom's wood joists only. No change to use, occupancy, zoning or egress.”
- Alteration, filed Feb 15, 2023, estimated cost $16K, described as “Interior alteration at apartment 5G. All as filed on plans filed herewith. No change to use, egress, zoning or occupancy.”
- Alteration, filed Feb 3, 2023, estimated cost $45K, described as “Interior renovation at apartment 5G. Install new finishes, partitions, ceiling, & light fixtures at kitchen & entry. Install new finishes at bathroom. All PL work filed under separate LAA application. No change to use, occupancy, zoning or…”
- Alteration, filed Mar 31, 2022, estimated cost $30K, described as “Gc work filed to renovate unit 3B. No change in use, occupancy, or egress.”
- Alteration, filed Jan 5, 2022
- Alteration, filed Nov 19, 2021, estimated cost $20K, described as “Interior renovation of apt 2G”
- Alteration, filed Nov 19, 2021, estimated cost $8K, described as “Plumbing work in apt 2G”
- Alteration, filed May 20, 2021, estimated cost $8K, described as “Facade reapir as per plans no change in use occupancy or egress under this application.”
- Alteration, filed May 3, 2021, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
Property taxes
- Assessment
- $2,721,156
- 2026–27 tax
- $326,720
- Market value (city estimate)
- $6,047,001
- Taxable value
- $2,721,156
- Assessed land
- $144,452
- Assessed improvements
- $2,576,704
- Condo units with their own tax lots
- 42
Tax breaks
- Co-op and condo abatement, with no end date, a $11,765 credit this tax year.
Zoning
R8: floor area ratio 3.46 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 18, 2026: $795,000, Apt 4D
- Aug 21, 2026: $335,000, Apt 2B
- Nov 21, 2025: $374,166, Apt 3B
- Jan 15, 2025: $500,000, Apt 4A
- Aug 23, 2024: $590,585, Apt 5E
- Aug 2, 2023: $500,000, Apt 4A
- Mar 31, 2023: $2,360,178, Apt 1A, sold with other lots
- Oct 6, 2022: $630,000, Apt 2G
- May 13, 2022: $485,000, Apt 3A
- May 11, 2022: $435,000, Apt 6G
The 10 most recent of 30 open-market sales since 2016, from the Department of Finance’s sales files.