# 628 Edgecombe Avenue, Manhattan

Outdoor pool · built 1949 · Block 2106, Lot 1.

On Umarelli: https://umarelli.org/nyc/1021060001/628-edgecombe-avenue

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 2106: https://umarelli.org/nyc/manhattan/2106.md

## Building permits

- Alteration, filed Feb 17, 2026, estimated cost $6K, described as “Installation of a temporary overhead protection and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 16, 2025, estimated cost $100K, described as “Installation of new sidewalk shed at 2301 amsterdam avenue, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 31, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 2301 amsterdam avenue, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 31, 2024, estimated cost $10K, described as “Installation of pipe scaffold at 2301 amsterdam avenue, manahttan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jul 26, 2024, estimated cost $530K, described as “Proposed structural work for the construction of mechanical dunnage and lintel repairs related to work filed under alteration type ii application #123450728. All as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2023, estimated cost $5K, described as “Temporary overhead protection as per drawings. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 20, 2023, estimated cost $19K, described as “Install new boiler in comfort station. No change to use, egress or occupancy under this application.”
- Alteration, filed May 16, 2023, estimated cost $10K, described as “Installation of chain link fence as per plan.”
- Alteration, filed Sep 7, 2022, estimated cost $20K, described as “Install new chimney liner and vents as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jun 16, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 4, 2021, estimated cost $9K, described as “Installation of temporary construction fence.”
- Alteration, filed Oct 2, 2019, estimated cost $1K, described as “Installation of temporary scaffold for worker access during construction within parks property. Scaffold shall comply with chapter 33 of the 2014 NYC cc. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $28,888,200
- Market value (city estimate): $64,196,000
- Taxable value: $0
- Assessed land: $23,627,700
- Assessed improvements: $5,260,500

## Zoning

PARK.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of High Bridge, Aqueduct and Pedestrian Walk (Individual Landmark). 29 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
