# 563 West 170th Street, Manhattan

New or merged lot · Block 2127, Lot 26.

The city hasn’t published tax or zoning records for this lot yet; new and merged lots usually appear within a few months.

On Umarelli: https://umarelli.org/nyc/1021270026/563-west-170-street

## Building permits

- New Building — Multi-Family, filed Jan 18, 2022, 26 units, 8 stories, described as “Proposed new 8 story residential/community facility building”
- Alteration, filed Mar 11, 2026, estimated cost $160K, described as “Modification of mechanical system for cellar and 1ST floors only in conjunction with alterationapplication #M01345952-I1”
- Alteration, filed Mar 3, 2026, estimated cost $259K, described as “Modification of existing sprinkler system for an existing 8-story building in conjunction with alt # M01345952 design as per hydraulic calculation nfpa-14 20216. No change in use, egress or occupancy.”
- Alteration, filed Feb 3, 2026, estimated cost $286K, described as “Proposed interior renovation for the tenant fit-out to the existing space, install new non-bearing partitions and doors, no change in use, egress and occupancy.”
- Alteration, filed Jun 1, 2023, estimated cost $5K, described as “Temporary hoist run-back structure during NB const, filed sep. Hoist run-back structure shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this appl. Hoist & elevator appl. Submitted sep.”
- Alteration, filed May 31, 2023, estimated cost $10K, described as “Single 6000 # capacity personnel/material hoist during NB const, filed sep. Hoist shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately”
- Alteration, filed May 5, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 24, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 16, 2022, estimated cost $27K, described as “Installation of temporary standpipe for entire building filed in conjuction with new building application #M00660854.”
- Alteration, filed May 13, 2022, estimated cost $1K, described as “Propose temporary construction fence in conjunction with new building # 121207023”
- Alteration, filed Jun 17, 2020, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 25, 2020, estimated cost $800, described as “This job is filed for construction fence for demolition work at 565 w 170 st., manhattan; job # 123810849.”

## In the news

[Leasing Launches for Meteora at 563 West 170th Street in Washington Heights, Manhattan](https://newyorkyimby.com/2024/11/leasing-launches-for-meteora-at-563-west-170th-street-in-washington-heights-manhattan.html), New York YIMBY, Nov 7, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
