# 633 West 155th Street, Manhattan

Museum · built c. 1921 · Block 2134, Lot 19.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1021340019/633-west-155-street

More construction in Washington Heights: https://umarelli.org/nyc/manhattan/washington-heights.md

Every lot on block 2134: https://umarelli.org/nyc/manhattan/2134.md

## Building permits

- Alteration, filed May 14, 2024, estimated cost $2K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 1, 2024, estimated cost $3K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 31, 2023, estimated cost $104K, described as “Boiler work to include removals as shown on plans (South Building).”
- Alteration, filed Jan 31, 2023, estimated cost $99K, described as “Boiler work to include removals as shown on plans (North Building). No mechanical work proposed under this application - all mechanical work is filed separately under job # M08005237-I1.”
- Alteration, filed Jan 31, 2023, estimated cost $700K, described as “Boiler work as shown on plans to include new installation(s). (South Building)”
- Alteration, filed Dec 28, 2022, estimated cost $100K, described as “Structural work as shown on plans (South Building)”
- Alteration, filed Dec 28, 2022, estimated cost $100K, described as “Structural work as shown on plans (North Building).”
- Alteration, filed Dec 28, 2022, estimated cost $150K, described as “General construction work as shown on plans (North Building).”
- Alteration, filed Dec 27, 2022, estimated cost $40K, described as “Plumbing work as shown on plans (North Building).”
- Alteration, filed Dec 22, 2022, estimated cost $300K, described as “General construction work as shown on plans (South Building).”
- Alteration, filed Dec 22, 2022, estimated cost $339K, described as “Mechanical work as shown on plans (North Building).”
- Alteration, filed Dec 21, 2022, estimated cost $200K, described as “Plumbing work as shown on plans (South Building).”
- Alteration, filed Dec 21, 2022, estimated cost $800K, described as “Mechanical work as shown on plans (South Building).”
- Alteration, filed Oct 4, 2022, estimated cost $10K, described as “Installation of temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 7, 2020, estimated cost $5K, described as “Plumbing application filed to install new bathroom fixtures.”
- Alteration, filed Jun 27, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 25, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $2,967,300
- Market value (city estimate): $6,594,000
- Taxable value: $0
- Assessed land: $549,000
- Assessed improvements: $2,418,300

## Tax breaks

- Nonprofit exemption (literary), with no end date, about $321,893 a year below the full tax.

## Zoning

R8: floor area ratio 2.48 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Audubon Terrace Historic District (Historic District). 23 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology