# 216 Ft Washington Avenue, Manhattan

Stadium · built 1944 · Block 2138, Lot 79.

On Umarelli: https://umarelli.org/nyc/1021380079/216-ft-washington-avenue

More construction in Washington Heights: https://umarelli.org/nyc/manhattan/washington-heights.md

Every lot on block 2138: https://umarelli.org/nyc/manhattan/2138.md

## Building permits

- Alteration, filed Aug 27, 2026, estimated cost $8K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 27, 2026, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code”
- Alteration, filed Jun 4, 2026, estimated cost $8K, described as “Proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed May 18, 2026, estimated cost $35K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 15, 2026, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code”
- Alteration, filed Sep 11, 2025, estimated cost $75K, described as “Architectural work on the 1st, 2nd, 3rd, 4th floor and roof as indicated on drawings.”
- Alteration, filed May 5, 2025, estimated cost $74K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 21, 2024, estimated cost $511K, described as “Standpipe work on the 1st and 4th floor as indicated on drawings.”
- Alteration, filed Nov 19, 2024, estimated cost $511K, described as “Sprinkler work on the 1st, 2nd, 3rd and 4th floor as indicated on drawings.”
- Alteration, filed Nov 19, 2024, estimated cost $2.4M, described as “Mechanical work on the 1st, 2nd, 3rd and 4th floor and roof as indicated on drawings.”
- Alteration, filed Oct 21, 2024, estimated cost $100K, described as “Structural work on the roof as indicated on drawings. Related job numbers - M01128735-I1, M01128741-I1, M01128746, M01128750-I1”
- Alteration, filed Oct 24, 2023, estimated cost $8.8M, described as “Filing herewith for the partial roof replacement , repair of interior finishes and the repair of wood/ceiling decking . There is no change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2023, estimated cost $2.6M, described as “Herewith filing for replacement of existing flooring, subfloor & trim. Painting of walls and existing hard ceilings, soffits, and built-ins, and trim as per the drawings. No change in use, egress o0r occupancy.”
- Alteration, filed May 26, 2023, estimated cost $685K, described as “Herewith filing for renovation of bathrooms on 1st and 2nd floors including floor finishes, ceiling system, doors, wall finishes. as per the drawings. .Demo and install exhaust air grilles and ductwork as per the drawings filed. No change…”
- Alteration, filed Dec 2, 2022, estimated cost $125K, described as “430 sqft interior renovation on floor 3, which includes the removal of exist. closet partitions; there is no structural work; there will be no change in use, occupancy, or egress; ref. additional filings for mech., plumbing, sprinkler…”
- Alteration, filed Aug 18, 2022, estimated cost $700K, described as “Replacing existing Boilers and Hot Water System, in kind.”
- Alteration, filed Mar 24, 2022, estimated cost $5K, described as “Installation of new sidewalk shed and pipe scaffold at 216 fort washington ave, ny, as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Jan 14, 2021, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 31, 2020, estimated cost $15K, described as “Replace split AC system One (1) condenser and one (1) evaporator..”
- Alteration, filed Nov 5, 2019, estimated cost $20K, described as “Modification of existing sprinkler system as shown on plans”
- Alteration, filed Nov 5, 2019, estimated cost $36K, described as “Ductwork modification for existing HVAC unit.”
- Alteration, filed Oct 16, 2019, estimated cost $10K, described as “Installation of new sidewalk shed at 216 fort washington avenue, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”

## Property taxes

- Assessment: $9,529,650
- Market value (city estimate): $21,177,000
- Taxable value: $0
- Assessed land: $2,740,500
- Assessed improvements: $6,789,150

## Zoning

R8: floor area ratio 3.00 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
