161 Ft Washington Avenue, Manhattan
Hospital · built 1989 · Block 2139, Lot 1.
Building permits
- Alteration, filed Nov 3, 2026, estimated cost $50K, described as “MHB 9HS: Phase 1: HVAC removals on partial 9th Floor, in the existing hospital as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Nov 3, 2026, estimated cost $300K, described as “MHB 9HS: Phase 1 Med Surg, Phase 2 McKeen: Interior demolition on partial 9th Floor in the existing hospital including removal of partitions and finishes as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Oct 22, 2026, estimated cost $420K, described as “Construct accessory cafe and kitchen on partial 1st floor.”
- Alteration, filed Oct 22, 2026, estimated cost $700K, described as “Provide ductwork and mechanical equipment to accommodate coffee shop renovations in the existing hospital as per plans filed herewith only.”
- Alteration, filed Oct 20, 2026, estimated cost $200K, described as “MHB 6HS: Interior demolition on partial 6th floor in the existing hospital including removal of partitions and finishes as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 17, 2026, estimated cost $1K, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress or occupancy.”
- Alteration, filed Aug 6, 2026, described as “Ira facade inspection/repairs”
- Alteration, filed Aug 4, 2026, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed May 29, 2026, estimated cost $426K, described as “Hh rad: modifications of partitions and finishes to accommodate alterations to the radiology suite within the existing hospital building as per plans.”
- Alteration, filed May 21, 2026, estimated cost $435K, described as “IR3: HVAC modifications including new ductwork and equipment in the IR patient treatment room in the existing hospital as per plans filed herewith.”
- Alteration, filed Feb 27, 2026, estimated cost $1.5M, described as “HIP Sprinkler: Sprinkler modifications within the existing medical office building as per plans. No change to use, egress or occupancy”
- Alteration, filed Dec 29, 2025, estimated cost $4.0M, described as “Milstein cwp: modifications to HVAC ductwork and piping including the installation of 6 condenser water pumps to accommodate the chiller replacement in the existing milstein hospital building as per plans filed herewith.”
- Alteration, filed Oct 8, 2025, described as “IRA to assist with Condition Assessment.”
- Alteration, filed Aug 18, 2025, estimated cost $2.2M, described as “Hh 02 cath labs & hybrid or: modification of interior partitions and finsihes to accommodate the cath lab and hybrid ors renovation within the exisitng hospital building as per plans”
- Alteration, filed Aug 12, 2025, estimated cost $453K, described as “Hip lobby renovation: canopy modications at the existing hospital building. No change to zoning, use or egress.”
- Alteration, filed Aug 12, 2025, estimated cost $1.1M, described as “Hh 02 cath labs & hybrid or: modification of HVAC ductwork, piping and equipment to accommodate the cath lab and hybrid ors renovation within the exisitng hospital building as per plans”
- Alteration, filed Jun 9, 2025, estimated cost $435K, described as “IR4 - renovation to part of the Milstein hospital building including new partitions and finishes to accommodate IR equipment replacement in the existing hospital in rooms 118 and 119, partial 4th floor.”
- Alteration, filed Jun 9, 2025, estimated cost $225K, described as “IR3 - renovation to part of the hospital building on 3rd floor including new partitions and finishes as per plans.”
- Alteration, filed Jun 5, 2025, estimated cost $615K, described as “IR4 new mechanical ductwork, piping, terminal equipment, and other devices will be provided as shown on plans, all work to accommdoate the renovaiton of the 4TH floor ir imaging equipment replacement in the exising milstein hospital…”
- Alteration, filed Jun 4, 2025, estimated cost $700K, described as “HIP-Aortic Center: Modification to interior partitions and finishes on partial 5th & 12th floor in the existing medical office building as per plans filed herewith, only no change to zoning, use, or occupancy.”
- Alteration, filed Jun 3, 2025, estimated cost $200K, described as “HIP Aortic Center: Modification of HVAC Equipment and ductwork to accommodate renovations on partial 5th & 12th floor within the existing hospital building, no change to use, egress, or occupancy.”
- Alteration, filed May 7, 2025, estimated cost $450K, described as “Hip linen distribution: modification of interior partitions and finishes to accommodate the linen distribution project in the exsiting hospital building. No change to use, egress or occupancy”
- Alteration, filed Apr 9, 2025, estimated cost $3.7M, described as “Mhb gn behavioral health: modification to interior partitions and finishes to accommodate the behavioral health renovation in the existing hospital building. No change to use, egress or occupancy.”
- Alteration, filed Apr 7, 2025, estimated cost $1.5M, described as “Mhb gn behavioral health: modification to HVAC ductwork, piping, and equipment to accommodate the behavioral health renovation in the existing hospital building. No change to use, egress or occupancy.”
- Alteration, filed Jan 11, 2025, estimated cost $727K, described as “Application filed to modify existing mechanical piping wok for broiler replacement as per plan. There is no change to use, egress or occupancy”
78 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $111,633,750
- Market value (city estimate)
- $248,075,000
- Taxable value
- $106,457,940
- Assessed land
- $8,550,000
- Assessed improvements
- $103,083,750
Zoning
R8: floor area ratio 3.64 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- NYP Irving Medical Cancer Center (City Planning 2022M0131): Authorization, Special Permit, Completed, decided Aug 22, 2024. NewYork-Presbyterian Hospital seeks a CPC authorization pursuant to ZR Section 79-21 to locate a new cancer care center within a LSCFD as well as a non-ULURP modification to amend the site plan and update zoning calculations of a…
- COLUMBIA PRESBYTERIAN MEDICAL CNTR (City Planning P2001M0119): Completed, decided Jan 5, 2001. 01DCP005M: NYPH PROPOSES TO CONSTRUCT AT THE COLUMBIA PRESBYTERIAN MEDI CAL CENTER AN ENLARGEMENT AND RENOVATION OF ITS BABIES AND C HILDREN'S HOSPITAL
- COLUMBIA/PRESBYTERIAN MEDICAL CENTR (City Planning P1989M0888): Completed, decided Feb 5, 1990. 82-212M: SPECIAL PERMIT TO PERMIT DEVELOPMENT OF A 10,361 SQ. FT. CAR DIOLOGY OFFICE BUILDING
- PRESBYTERIAN HOSPITAL/W165 ST BRDGE (City Planning P1988M0039): Completed, decided Apr 14, 1988. CONSENT TO CONSTRUCT, MAINTAIN & OPERATE THE BRIDGE THAT*WOULD CONNECT THE ATCHLEV PAVILION AT 161 FORT WASHINGTON*AVE WITH THE PKING GARAGE AT 115-145 FORT WASHINGTON AVE
- PRESBYTERIAN HOSPITAL (City Planning P1987M0344): Completed, decided Mar 10, 1988. CONSENT TO MAINTAIN & USE PEDESTRIAN & SERVICE TUNNEL UNDER*& ACROSS. BL2139 LOT1. BL2138 LOT40.
- PRESBYTERIAN HOSPITAL (City Planning P1987M0343): Completed, decided Feb 16, 1988. CONSENT TO MAINTAIN & USE ARCH TILE CONDUIT UNDER & ACROSS.*BL2139 LOT1. BL2136 LOT245.
- COLUMBIA PRESBYTERIAN MEDICAL CNTR (City Planning P1988M0037): Completed, decided Sep 28, 1987. 1ST MODIF OF A SPEC PERMIT FOR A LSCFD RESULTING IN A NET*REDUCTION OF FLR AREA OF APPROX 3,000SF