1 Haven Avenue, Manhattan
Hospital · built 1975 · Block 2139, Lot 51.
Building permits
- Alteration, filed Jun 3, 2026, estimated cost $40K, described as “Application filed for renovation of HHS 13 Microbiology Lab & Equipment Room (fire rating compliance). Renovation includes but not limited to partitions, ceiling, door, frames and casework. No changes to use, egress or occupancy”
- Alteration, filed Aug 14, 2025, estimated cost $538K, described as “Mechanical modification, evaportador units, pipe & ductwork, condensing units”
- Alteration, filed Jun 18, 2025, estimated cost $500K, described as “Application file for roofing replacement as per plan. There is no change to use, egress, or occupancy filed.”
- Alteration, filed Aug 13, 2024, estimated cost $155K, described as “High pressure steam expansion joint replacement as per plans. No change of use, occupancy or egress.”
- Alteration, filed Mar 26, 2024, described as “Suspended scaffold (CD5) permit renewal”
- Alteration, filed Sep 19, 2023, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jul 18, 2023, estimated cost $2.0M, described as “Application filed for facade cycle 9A repairs”
- Alteration, filed Mar 15, 2023, estimated cost $250K, described as “Application file to install new guardrail as per plan. There is no change to use, egress, or occupancy filed.”
- Alteration, filed Oct 11, 2022, estimated cost $60K, described as “Application filed for steel framing work. NO CHNAGES IN USE, EGRESS, OCCUPANCY AND BULK”
- Alteration, filed Jul 26, 2022, estimated cost $3.9M, described as “Change of occupancy from library and offices (UG 3) to laboratories and offices (UG 3). installation of partitions throughout”
- Alteration, filed Jul 6, 2022, estimated cost $50K, described as “Installation of a temporary core protection system to prepare the area of work as a shell spacefor construction work under a separate application.”
- Alteration, filed Jul 5, 2022, estimated cost $300K, described as “Interior demolition of non load bearing partitions”
- Alteration, filed Jun 23, 2022, estimated cost $28K, described as “Fire Pump Replacement”
- Alteration, filed Aug 31, 2021, estimated cost $350K, described as “Lab renovation. Partitions, ceiling, walls finishes, flooring”
- Alteration, filed Aug 30, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 30, 2021, estimated cost $20K, described as “Sprinkler modifications”
- Alteration, filed Aug 30, 2021, estimated cost $70K, described as “Mechanical modifications. Repair ductwork and insulation”
- Alteration, filed Jan 30, 2020, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 1, 2019, described as “Installation of heavy-duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 15, 2019, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jul 5, 2018, estimated cost $32K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $26,796,600
- Market value (city estimate)
- $59,548,000
- Taxable value
- $0
- Assessed land
- $675,000
- Assessed improvements
- $26,121,600
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $2,906,895 a year below the full tax.
Zoning
R8: floor area ratio 6.51 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- W168TH ST BRIDGE (City Planning P1988M0038): Completed, decided Apr 14, 1988. 88-019M: CONCENT TO CONSTRUCT MANTAIN AND OPERATE A PEDESTRIAN BRIGE TO CONNECT THE NEUROLOGICAL INSTITUTE WITH THE HAMMER HEALTH CENTER