# 193 Ft Washington Avenue, Manhattan

Hospital · built 1948 · Block 2139, Lot 85.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1021390085/193-ft-washington-avenue

More construction in Washington Heights: https://umarelli.org/nyc/manhattan/washington-heights.md

Every lot on block 2139: https://umarelli.org/nyc/manhattan/2139.md

## Building permits

- Alteration, filed Jan 13, 2026, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress, or occupancy. The sidewalk shed on the highline (west) elevation, west 13TH st. Elev. The sidewalk shed at ft washington ave, haven ave, and next to the…”
- Alteration, filed Sep 25, 2025, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops”
- Alteration, filed Sep 3, 2025, estimated cost $900K, described as “Facade restoration as per plans including removal and replacement of cracked or spalled brick masonry, Removal and replacement of steel lintel., Metal facade panel repair”
- Alteration, filed May 24, 2023, estimated cost $1K, described as “Filing herewith for use of mechanical means DS1 in conjunction with application #M00839215-I1. No change in use, egress, or occupancy.”
- Alteration, filed Mar 21, 2023, estimated cost $100K, described as “Architectural renovation for phase ii of neuro mri as per plans filed herewith. No change in use, egress, or occupancy under this application.”
- Alteration, filed Oct 19, 2022, estimated cost $1.6M, described as “Mechanical modifications as per plans”
- Alteration, filed Sep 8, 2022, estimated cost $40K, described as “Plumbing modifications to accommodate the the ni-8 fit out in the existing building as per plans filed herewith.”
- Alteration, filed Aug 22, 2022, estimated cost $80K, described as “Modification to HVAC piping and ductwork to accommodate the ni-8 fit out in the existing building as per plans filed herewith.”
- Alteration, filed Aug 19, 2022, estimated cost $65K, described as “Sprinkler modifications to accommodate the ni-8 fit out in the existing building.”
- Alteration, filed Jul 28, 2022, estimated cost $185K, described as “Plumbing modifications to accommodate the ni-8 fit out in the existing building.”
- Alteration, filed Jul 28, 2022, estimated cost $670K, described as “Installation of ductwork and piping to accommodate the ni-8 fit out in the existing building as per plans filed herewith.”
- Alteration, filed Jun 9, 2022, estimated cost $65K, described as “Sprinkler/ standpipe modifications to accommodate the ni-8 fit out in the existing building.”
- Alteration, filed Jun 9, 2022, estimated cost $35K, described as “Structural work to accommodate the ni-8 fit out in the existing building as per plans filed herewith.”
- Alteration, filed Jun 8, 2022, estimated cost $640K, described as “Installation of interior partitions and finishes to accommodate the ni-08 fit out in the existing building. No change to zoning, use, or occupancy. All work as per plans filed herewith.”
- Alteration, filed Apr 18, 2022, estimated cost $225K, described as “Interior demolition on 8th floor of the existing hospital building as per plans filed herewith only. No change to zoning , use, egress, occupancy.”
- Alteration, filed Apr 15, 2022, estimated cost $5K, described as “Plumbing removals on 8th floor as per plans.”
- Alteration, filed Apr 15, 2022, estimated cost $45K, described as “Removal of ductwork and equipment on 8th floor in the hospital building as per plans filed herewith only.”
- Alteration, filed Mar 10, 2020, estimated cost $221K, described as “Modifications to plumbing and sprinkler as per plans”
- Alteration, filed Nov 15, 2019, estimated cost $1K, described as “Installation of temporary plywood enclosure as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jan 30, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 20, 2018, estimated cost $5K, described as “Installation of temporary construction fence during plaza renovations within the property line”
- Alteration, filed Dec 12, 2018, estimated cost $5K, described as “Installation of construction fence on plaza for pedestrian protection . fence is set back on private property”
- Alteration, filed Nov 5, 2018, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 12, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Building history

- Alteration, filed Mar 11, 1994, permit issued - entire job/work, described as “Increase occupancy on 1ST flr as shown o n dwgs filed herewith.”
- Alteration, filed May 20, 1992, permit issued - partial job, described as “Enlarge existing structure, new foundati on new walls, new floors.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $8,567,550
- 2026–27 Tax: $1,557
- Market value (city estimate): $19,039,000
- Taxable value: $14,339
- Assessed land: $1,125,000
- Assessed improvements: $7,442,550

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $884,787 a year below the full tax.

## Zoning

R8: floor area ratio 6.31 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- NYP Irving Medical Cancer Center (City Planning 2022M0131): Authorization, Special Permit, Completed, decided Aug 22, 2024. NewYork-Presbyterian Hospital seeks a CPC authorization pursuant to ZR Section 79-21 to locate a new cancer care center within a LSCFD as well as a non-ULURP modification to amend the site plan and update zoning calculations of a…
- COLUMBIA PRESBYTERIAN MEDICAL CNTR (City Planning P2001M0119): Completed, decided Jan 5, 2001. 01DCP005M: NYPH PROPOSES TO CONSTRUCT AT THE COLUMBIA PRESBYTERIAN MEDI CAL CENTER AN ENLARGEMENT AND RENOVATION OF ITS BABIES AND C HILDREN'S HOSPITAL
- COLUMBIA/PRESBYTERIAN MEDICAL CENTR (City Planning P1989M0888): Completed, decided Feb 5, 1990. 82-212M: SPECIAL PERMIT TO PERMIT DEVELOPMENT OF A 10,361 SQ. FT. CAR DIOLOGY OFFICE BUILDING
- W168TH ST BRIDGE (City Planning P1988M0038): Completed, decided Apr 14, 1988. 88-019M: CONCENT TO CONSTRUCT MANTAIN AND OPERATE A PEDESTRIAN BRIGE TO CONNECT THE NEUROLOGICAL INSTITUTE WITH THE HAMMER HEALTH CENTER
- COLUMBIA PRESBYTERIAN MEDICAL CNTR (City Planning P1988M0037): Completed, decided Sep 28, 1987. 1ST MODIF OF A SPEC PERMIT FOR A LSCFD RESULTING IN A NET\*REDUCTION OF FLR AREA OF APPROX 3,000SF

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
