# 549 Audubon Avenue, Manhattan

Public School · built c. 1925 · Block 2160, Lot 18.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1021600018/549-audubon-avenue

More construction in Washington Heights: https://umarelli.org/nyc/manhattan/washington-heights.md

Every lot on block 2160: https://umarelli.org/nyc/manhattan/2160.md

## Building permits

- Alteration, filed Oct 2, 2026, estimated cost $300K, described as “File mechanical work to install (20)twenty split HVAC units at basement courtyard and 1ST floor courtyard for 1ST fl. W/ mezzanine auditorium of public school M465. No change in use, egress, or occupancy.”
- Alteration, filed Jul 22, 2026, estimated cost $38K, described as “Repair of existing roofing system.”
- Alteration, filed May 13, 2026, estimated cost $1K, described as “Proposed: Hoist installation and use as per plans filed herewith in conjunction with M01244730. No change of use, egress or occupancy.”
- Alteration, filed Dec 19, 2025, estimated cost $1.0M, described as “Room 347: Install new science lab”
- Alteration, filed Dec 17, 2025, estimated cost $1.1M, described as “Room 318: Remove existing since lab and associated equipment / finishes; Replace finishes and move college office furniture to this room.”
- Alteration, filed Dec 16, 2025, estimated cost $25K, described as “Installation of scaffold for access to work locations.”
- Alteration, filed Dec 14, 2025, estimated cost $16K, described as “Installation of temporary construction fence in conjunction with DOB now job # M01222546”
- Alteration, filed Dec 12, 2025, estimated cost $25K, described as “Installation of sidewalk shed for public protection during construction work. Inconjunction with job # M01222546,M01244730”
- Alteration, filed Nov 26, 2025, estimated cost $78K, described as “Remove existing doors, frames, thresholds, sinks, toilets, and chase walls in rooms 107 & 171. Install new door, frame, thresholds, sinks, toilets, and chase walls in rooms 107 & 171.”
- Alteration, filed Jun 27, 2025, estimated cost $610K, described as “General Construction related to Heat Plant upgrade”
- Alteration, filed May 22, 2025, estimated cost $100K, described as “General Construction related installation of new steam traps for new Heat plant upgrade”
- Alteration, filed Apr 30, 2025, estimated cost $20K, described as “Pmm-george washington hs for temporary shoring of deteriorated slab, submitting on behalf of contractor, related llw number # 133706 no change in use, occupancy or egress”
- Alteration, filed Apr 7, 2025, estimated cost $250K, described as “General Construction related to the partial removal of the existing boilers”
- Alteration, filed Jul 26, 2024, estimated cost $4K, described as “Convert office rooms 409 & 421 into bathrooms. In room 409, install new partition wall to create toilet partition and (1) WC, (1) LAV, & (1) Floor Drain. In room 421, install new furred out walls and (3) WCs, (2) LAVs, & (1) Floor drain.”
- Alteration, filed Mar 14, 2024, estimated cost $20K, described as “Pmm/george washington hs - for temporary emergency cracked beam support submitting on behalf of contractor, in conjunction with LLW#133706 no change in use, occupancy or egress”
- Alteration, filed Sep 13, 2023, estimated cost $15K, described as “Filing for the installation of construction fence on behalf of contractor”
- Alteration, filed Jul 17, 2023, estimated cost $25K, described as “M465-proposed construction fence.”
- Alteration, filed May 5, 2023, estimated cost $7K, described as “Replace existing ladder and railing, remove existing vent and patch wall and floor.”
- Alteration, filed Apr 24, 2023, estimated cost $35K, described as “Proposed supported scaffold.”
- Alteration, filed Mar 31, 2023, estimated cost $17K, described as “Replace existing metal stair, ladder and railing. Remove existing vent and patch wall. Cover existing smoke vent.”
- Alteration, filed Mar 16, 2023, estimated cost $37K, described as “M465- proposed sidewalk shed.”
- Alteration, filed Feb 16, 2023, estimated cost $20K, described as “Fn/george washington hs - for temporary construction equipment(emergency fence) submitting on behalf of contractor, in conjunction with llw# 133706 no change in use, occupancy or egress”
- Alteration, filed Apr 13, 2022, estimated cost $1.3M, described as “Clear vegetation from area to allow for structural work to be conducted. Sawcut and remove concrete paving at new retaining walls. Install new concrete paving after installation of new retaining wall.”
- Alteration, filed Feb 10, 2022, estimated cost $871K, described as “OT: Interior Renovation including replacement of doors, flooring, partitions, millwork. and ceilings. ST: Installation of new steel dunnage and reinforcement. No change in Use, Occupancy, and Egress.”

## Property taxes

- Assessment: $24,291,450
- Market value (city estimate): $53,981,000
- Taxable value: $0
- Assessed land: $6,659,550
- Assessed improvements: $17,631,900

## Zoning

R7-2: floor area ratio 1.22 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
