# 600 West 181st Street, Manhattan

Commercial · built c. 1900 · Block 2162, Lot 63.

On Umarelli: https://umarelli.org/nyc/1021620063/600-west-181-street

More construction in Washington Heights: https://umarelli.org/nyc/manhattan/washington-heights.md

Every lot on block 2162: https://umarelli.org/nyc/manhattan/2162.md

## Building permits

- Alteration, filed Sep 14, 2026, estimated cost $3K, described as “Target: Modifications to the Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01411084 (GC).”
- Alteration, filed Sep 12, 2026, estimated cost $177K, described as “Target: Interior modifications to convert the former CVS space into accessory storage as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01425907-I1 (MS)”
- Alteration, filed Mar 14, 2025, estimated cost $500, described as “Job filed to obtain eup cards omitted from orginal application .#120566510 which was already signed off.”
- Alteration, filed Feb 21, 2025, estimated cost $34K, described as “Interior non-structural demolition of existing CVS pharmacy area within existing Target store and repair/replacement of area's finishes for future mercantile/sales.”
- Alteration, filed Feb 17, 2025, estimated cost $3K, described as “Remove and cap at main water line existing sanitary piping (for sink) back to wall as per plans.”
- Alteration, filed Aug 21, 2023, estimated cost $1K, described as “Erect illuminated d/f projecting accessory business sign; copy reading "apple bank with logo"”
- Alteration, filed Aug 21, 2023, estimated cost $8K, described as “Erect illuminated accessory business wall sign; copy reading "apple bank with logo"”
- Alteration, filed Aug 21, 2023, estimated cost $3K, described as “Erect aluminum signband on exterior facade above storefront”
- Alteration, filed Jul 3, 2023, estimated cost $75K, described as “Plumbing work to replace the backflow prevention devices with new code compliant backflow preventers for Target space”
- Alteration, filed Apr 7, 2023, estimated cost $20K, described as “Sprinkler modifications on cellar and 1ST floor as per shown on plans filed herewith. No change in egress, occupancy, or use.”
- Alteration, filed Mar 27, 2023, estimated cost $15K, described as “Plumbing modifications on cellar, 1ST floor, and roof as per shown on plans filed herewith. Filed in conjunction with gc application M00835514-I1. No change in egress, occupancy, or use.”
- Alteration, filed Mar 27, 2023, estimated cost $55K, described as “Mechanical modifications on cellar, 1ST floor, and roof as per shown on plans filed herewith. No change in egress, occupancy, or use.”
- Alteration, filed Mar 24, 2023, estimated cost $3K, described as “Temporary placement of construction fence. during facade construction as per shown on plans filed herewith.”
- Alteration, filed Mar 24, 2023, estimated cost $50K, described as “Steel and concrete reinforcement of cellar and ground floor of existing 2-story building for new bank vault and atm machines, safes, and cash recycler machines; replacement of existing rat slab at cellar.”
- Alteration, filed Mar 23, 2023, estimated cost $668K, described as “Architectural modifications on facade, cellar and first floors as per shown on plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed Jun 8, 2021, estimated cost $600, described as “Interior illuminated non advertising accessory hanging sign - in property lines - cvs pharmacy. No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $1K, described as “Illuminated non advertising accessory wall sign - (target bulls eye logo). No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $1K, described as “Illuminated non advertising accessory wall sign - (target bulls eye logo). No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $1K, described as “Illuminated non advertising accessory wall sign - (target bulls eye logo). No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $1K, described as “Illuminated non advertising accessory wall sign - (target bulls eye logo). No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $2K, described as “Illuminated non advertising accessory wall sign - target. No change of use, egress or occupancy.”
- Alteration, filed Jun 8, 2021, estimated cost $4K, described as “Illuminated non advertising accessory wall sign - (target bulls eye logo). No change of use, egress or occupancy.”
- Alteration, filed Apr 12, 2021, estimated cost $17K, described as “Replace HVAC equipment for existing eating and drinking establishment”
- Alteration, filed Apr 10, 2021, estimated cost $50K, described as “Renovation of existing eating and drinking establishment. Revise plumbing and sprinkler system, and plumbing fixtures, and cooking equipment.”
- Alteration, filed Apr 8, 2021, estimated cost $138K, described as “Renovation of existing eating and drinking establishment.”

14 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1021620063/600-west-181-street.

## Building history

- Alteration, filed May 18, 2020, signed off Aug 6, 2024, described as “Change of use at a portion of the first floor and entire second floor from use group 6, retail to use group 10, department store. Minor partition work at the first floor.”
- Alteration, filed Jul 10, 2000, signed off Jan 22, 2016, described as “Filing to obtain certificate of occupanc for eating and drinking place.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $13,862,700
- 2026–27 Tax: $1,354,493
- Market value (city estimate): $30,806,000
- Taxable value: $12,486,110
- Assessed land: $1,845,000
- Assessed improvements: $12,017,700

## Zoning

C4-4 (part of the lot is R7-2): floor area ratio 2.01 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
