# 407 W 206th Street, Manhattan

Condominium · 474 units · built 2023 · Block 2203, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1022037502/407-west-206-street

More construction in Inwood: https://umarelli.org/nyc/manhattan/inwood.md

## Building permits

- New Building — Mid-Rise, filed Oct 21, 2021, 474 units, 14 stories, described as “Affordable high-rise new building. Hub consultation on 6/24/21 (consult done under 430 west 207th st). Please assign to same hub examiner as related NB # M00599489.”
- Alteration, filed Jun 23, 2026, estimated cost $250, described as “Install exterior non-illuminated d/f blade sign on wall (the people's theatre)”
- Alteration, filed Jun 2, 2026, estimated cost $700, described as “Non-illuminated non-advertising accessory sign on side of existing marquee - centro cultural inmigrante. No change of use, egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $2K, described as “Illuminated non-advertising accessory sign on front of existing marquee - the people's theatre. No change of use, egress or occupancy.”
- Alteration, filed Apr 7, 2026, estimated cost $40K, described as “Installationof split system air cooled air conditioning units with ductwork.”
- Alteration, filed Apr 7, 2026, estimated cost $28K, described as “New plumbing work for phamacy.”
- No Work, filed Feb 23, 2026
- Alteration, filed Feb 9, 2026, estimated cost $91K, described as “Interior non-structural renovation for pharmacy fit-out within an existing space. No change in use, egress, or occupancy.”
- No Work, filed Apr 18, 2025
- Alteration, filed Feb 10, 2025, estimated cost $1K, described as “Fit out of theater space in conjunction with NB # M00599495. Review to be done under 2014 code.”
- Alteration, filed Dec 28, 2023, estimated cost $40K, described as “Construction fence as per drawings during NB const (M00599495), filed sep. Fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Dot permits by others for fence installed on…”
- Alteration, filed Jul 17, 2023, estimated cost $1K, described as “Installation and use of temporary interior climbing platforms. No change in use, egress, or occupancy.”
- Alteration, filed Jun 7, 2023, estimated cost $20K, described as “Installation of 6000 lb dual car personnel/material hoist @ south as per plans during construction. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 7, 2023, estimated cost $20K, described as “Installation of 6000 lb dual car personnel/material hoist @ north as per plans during construction. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 6, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed and overhead protection as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed May 11, 2023, estimated cost $3K, described as “Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 25, 2023, estimated cost $1K, described as “Intallation and use of temporary concrete placing boom. No change in use, egress, or occupancy.”
- Alteration, filed Apr 13, 2023, estimated cost $1K, described as “Application for the installation and use of material platform as per plans filed here. No change in egress, use or occupancy,”
- Alteration, filed Jan 24, 2023, estimated cost $1K, described as “Installation and use of temporary exterior climbing platform as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 7, 2022, estimated cost $40K, described as “Installation of construction fence as per drawings during NB const (M00599495), filed sep. Fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Fence installed on sw / rdwy. Dot…”
- Alteration, filed Apr 28, 2022, estimated cost $5K, described as “Temporary construction plywood fence for 421A piles work. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Nov 23, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed and overhead protection as per plans.sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Jul 15, 2021, estimated cost $10K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”

## Property taxes

- Assessment: $60,212,702
- 2026–27 tax: $7,360,553
- Market value (city estimate): $133,806,000
- Taxable value: $60,212,701
- Assessed land: $1,431,001
- Assessed improvements: $58,781,701
- Condo units with their own tax lots: 6

## Zoning

R8A: floor area ratio 6.37 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 9, 2026: $25,675,000, Apt 5

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[405, 407 West 206th Street Rise Past Halfway Mark in Inwood, Manhattan](https://newyorkyimby.com/2024/02/405-407-west-206th-street-rise-past-halfway-mark-in-inwood-manhattan.html), New York YIMBY, Feb 16, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
