# 138 Bruckner Boulevard, The Bronx

Apartment building · 448 units · built 2023 · Block 2260, Lot 10.

On Umarelli: https://umarelli.org/nyc/2022600010/138-bruckner-boulevard

More construction in Mott Haven and Port Morris: https://umarelli.org/nyc/bronx/mott-haven-and-port-morris.md

## Building permits

- New Building — Mid-Rise, filed Dec 22, 2021, 448 units, 12 stories, described as “Construct twelve (12) new building per plans filed herewith.”
- Alteration, filed Aug 2, 2023, estimated cost $6K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 10, 2023, estimated cost $1K, described as “Installation of supported scaffold as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 7, 2023, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress oroccupancy.”
- Alteration, filed Jun 30, 2023, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 26, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 26, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 18, 2022, estimated cost $10K, described as “Proposed to cap and remove sprinkler system in conjuction with full demo JOB#220739066. No change to use, egress or occupancy under this application.”
- Alteration, filed May 3, 2022, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”
- Alteration, filed Mar 1, 2022, estimated cost $1K, described as “Install combined sprinkler/standpipe system as per plans filed herewith. Filed in conjunction with NB#X00643715.”
- Alteration, filed Feb 17, 2022, estimated cost $1K, described as “Install temporary standpipe system as per plans filed herewith. No change to use, egress or occupancy. Filed in conjunction with NB# X00643715.”
- Alteration, filed Feb 11, 2022, estimated cost $1K, described as “Curb Cut Application”
- Alteration, filed Jan 14, 2022, estimated cost $1K, described as “Foundation filing in conjunction with new building, job number X00643715-I1. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $36,398,250
- 2026–27 tax: $137,330
- Market value (city estimate): $80,885,000
- Taxable value: $1,104,030
- Assessed land: $911,250
- Assessed improvements: $35,487,000

## Tax breaks

- 421-a exemption, through Jun 30, 2060, about $4,390,248 a year below the full tax.

## Zoning

M1-5/R8A: floor area ratio 8.25 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jan 13, 2022: $35,000,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## In the news

[New Renderings Released For ONE38 At 138 Bruckner Boulevard in Mott Haven, The Bronx](https://newyorkyimby.com/2024/05/new-renderings-released-for-one38-at-138-bruckner-boulevard-in-mott-haven-the-bronx.html), New York YIMBY, May 19, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
