# 40 Bruckner Boulevard, The Bronx

Apartment building · 365 units · built 2022 · Block 2295, Lot 51.

On Umarelli: https://umarelli.org/nyc/2022950051/40-bruckner-boulevard

More construction in Mott Haven and Port Morris: https://umarelli.org/nyc/bronx/mott-haven-and-port-morris.md

## Building permits

- New Building — Mid-Rise, filed Jun 2, 2021, 365 units, 12 stories, described as “Construct new 12 story mixed use building per plans filed.”
- No Work, filed Dec 13, 2022
- Alteration, filed Dec 5, 2022, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 23, 2022, estimated cost $6K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 13, 2022, estimated cost $1K, described as “Installation of outrigger platform in accordance with nycc chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Aug 24, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 24, 2022, estimated cost $4K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 2, 2022, estimated cost $4K, described as “8' construction fence”
- Alteration, filed Nov 10, 2021, estimated cost $6K, described as “Removal of Sprinkler System throughout building in conjunction with full demolition. No change in egress, use, or occupancy.”
- Alteration, filed Nov 3, 2021, estimated cost $4K, described as “8' construction fence”
- Alteration, filed Nov 2, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2021, estimated cost $1K, described as “Curb cut application filed in conjucntion with new building application # X00526919.”
- Alteration, filed Aug 6, 2021, estimated cost $1K, described as “Install temporary dry standpipe system during construction as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# X00526919.”
- Alteration, filed Aug 6, 2021, estimated cost $1K, described as “Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# X00526919.”

## Property taxes

- Assessment: $18,629,550
- 2026–27 tax: $113,071
- Market value (city estimate): $41,399,000
- Taxable value: $909,000
- Assessed land: $557,550
- Assessed improvements: $18,072,000

## Tax breaks

- 421-a exemption, through Jun 30, 2059, about $2,204,259 a year below the full tax.

## Zoning

M1-5/R8A: floor area ratio 7.37 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## In the news

[New Images Revealed For Bruckner House at 40 Bruckner Boulevard in Mott Haven, The Bronx](https://newyorkyimby.com/2024/04/new-images-revealed-for-bruckner-house-at-40-bruckner-boulevard-in-mott-haven-the-bronx.html), New York YIMBY, Apr 28, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
