- Alteration, filed Jan 17, 2025, estimated cost $1K, described as “Filing for pluming work of 2 compartment sink and employee sink. No change in use egress or occupancy.”
- Alteration, filed Apr 7, 2023, estimated cost $1K, described as “Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Jul 29, 2022, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 29, 2022, estimated cost $1K, described as “Easy Scale Multipoint Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 28, 2022, estimated cost $1K, described as “Installation of 12.8' curb cut with 1.5" splays on each side (15.8' total) on Third Avenue. Application filed in conjunction with NB# 210181202, BPP# 240301758 & CC# X00667167.”
- Alteration, filed Feb 28, 2022, estimated cost $1K, described as “Installation of 8' curb cut with 1.5" splays on each side (12.0 total) on East 134th St. Application filed in conjunction with NB# 210181202, BPP# 240301758 & CC# X00667165.”
- Alteration, filed Jan 11, 2022, estimated cost $17K, described as “Installation of 6000 lb dual car personnel/material hoist as per plans during construction. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 22, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed, overhead protection and roof protection as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Sep 27, 2021, estimated cost $20K, described as “Installation of temporary manual dry stanpipe system.”
- Alteration, filed Jul 19, 2021, estimated cost $5K, described as “Installation of construction fence as per plans. Construction fence shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed May 18, 2021, estimated cost $1K, described as “Installation of sprinkler / standpipe system in conjunction with NB construction #210181202.”
- Alteration, filed May 17, 2021, estimated cost $1K, described as “Support of Excavation work in conjunction with soil remediation.”
- Alteration, filed Apr 27, 2021, estimated cost $1K, described as “Structural work filed in conjunction with NB construction - NB# 210181202.”
- Alteration, filed Apr 16, 2021, estimated cost $8K, described as “Installation of scaffold on top of cantilevered platform during bldg dm filed sep. Cantilevered platform filed under sep application. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this…”
- Alteration, filed Apr 16, 2021, estimated cost $10K, described as “Installation of temporary cantilevered platform as per drawings during bldg dm, filed sep. Cantilevered platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 5, 2021, estimated cost $80K, described as “Installation of scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 29, 2021, estimated cost $1K, described as “Plumbing work filed in conjunction with NB Construction (210181202). NYCECC Compliance reviewed under related NB application filed in BIS.”
- Alteration, filed Mar 29, 2021, estimated cost $1K, described as “Mechanical work filed in conjunction with NB Construction (210181202). NYCECC Compliance reviewed under related NB application filed in BIS.”
- Alteration, filed Feb 3, 2021, estimated cost $20K, described as “Filing for demolition / removal of existing billboard sign at 2413 3RD avenue, bronx ny. No chane in use, egress or occupancy.”
- Alteration, filed Feb 2, 2021, estimated cost $25K, described as “Interior demolition of 6 story brick building. Non-structural demolition of walls, doors & interior partitions per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 25, 2020, estimated cost $25K, described as “Installation of plywood fence during building demolition, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $16,187,400
- 2026–27 tax
- $176,334
- Market value (city estimate)
- $35,972,000
- Taxable value
- $1,417,590
- Assessed land
- $249,750
- Assessed improvements
- $15,937,650
Tax breaks
- 421-a exemption, through Jun 30, 2059, about $1,837,217 a year below the full tax.
Zoning
M1-3/R8: floor area ratio 7.89 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29).
Recent sales
- Mar 18, 2020: $23,714,511, 39,426 sq ft, sold with other lots
- Sep 28, 2016: $17,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Special Harlem River Waterfront District Expansion (City Planning P2016X0056): Completed, decided Dec 16, 2017. This is a public application by the Department of City Planning requesting a (C 170413 ZMX) zoning map amendment and (N 170414 ZRX) zoning text amendment to modify the existing Special Harlem River Waterfront District to expand the HRW to…
In the news
New Lease Signed At 2413 Third Avenue In Mott Haven, The Bronx, New York YIMBY, Dec 13, 2024.