290 East 149th Street, The Bronx
Apartment building · 164 units · built 2024 · Block 2330, Lot 16.
Building permits
- Alteration, filed Feb 5, 2026, estimated cost $201K, described as “Interior partition wall renovation: no change of use, egress, floor area, footprint, and strusture. No vertical / horizontal extension and enlargement. No change in envelope or any item affecting the energy of the bldg.”
- Alteration, filed Feb 5, 2026, estimated cost $1K, described as “Non-illuminated non-advertising accessory wall sign - marci parking. No change of use, egress or occupancy.”
- Alteration, filed Jan 29, 2026, estimated cost $10K, described as “Installation of 15 LF Curb Cut in conjunction with NB # 210178948.”
- Alteration, filed Nov 3, 2025, estimated cost $30K, described as “General construction for I-4 daycare use, ages 0-13, 58 children and 19 adults.”
- Alteration, filed Sep 25, 2024, estimated cost $190K, described as “Installation of 52.8 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Aug 7, 2024, estimated cost $150K, described as “Installation of Gas Generator on Roof in conjunction with New Building # 210178948. No change in egress, use, occupancy, or zoning.”
- Alteration, filed May 14, 2024, estimated cost $1.0M, described as “Super-Structure for New Ten (10) Story Mixed Use Dwelling.”
- Alteration, filed Feb 5, 2024, estimated cost $10K, described as “Installation of a single personnel/material hoists. Car # 1 shall be 6000# capacity during new building const filed sep. Hoists shall comply with the 2022 bldg codes, ch #33. No change in use, occ or egress under this app elev appl filed…”
- Alteration, filed Feb 5, 2024, estimated cost $10K, described as “Installation of a single personnel/material hoists. Car # 2 shall be 7000# capacity during new building const filed sep. Hoists shall comply with the 2022 bldg codes, ch #33. No change in use, occ or egress under this app elev appl filed…”
- Alteration, filed Jun 14, 2023, estimated cost $1K, described as “Foundation/Earthwork for the New Building filed under NB 210178948. No change in egress use or occupancy.”
- Alteration, filed Jun 14, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, roof protection, and overhead protection as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 14, 2023, estimated cost $20K, described as “Temporary construction fence”
- Alteration, filed Jan 20, 2023, estimated cost $1K, described as “Filing for installation of plumbing systems in new building filed under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $1K, described as “Installation of Mechanical Systems filed in conjunction with New Building work under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $2K, described as “Installation of Sprinkler-Standpipe System in conjunction with New Building # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $1K, described as “Installation of Temporary Standpipe System in conjunction with New Building filing under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 27, 2022, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence to protect site, during full demolition”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence, to protect site during full demolition.”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence to protect site during full demolition”
- Alteration, filed Apr 12, 2022, estimated cost $5K, described as “Installation of temporary overhead protection at adjacent property during bldg demolition, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 23, 2021, estimated cost $7K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $9,175,050
- 2026–27 tax
- $119,439
- Market value (city estimate)
- $20,389,000
- Taxable value
- $1,050,626
- Assessed land
- $1,017,450
- Assessed improvements
- $8,157,600
Tax breaks
- Article XI exemption, through Jun 30, 2063, about $993,989 a year below the full tax.
- Solar abatement, through Jun 30, 2030, a $11,249 credit this tax year.
Zoning
C4-4: floor area ratio 4.93 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 26, 2020: $1,150,000, 2,880 sq ft ($399 per sq ft)
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
290 East 149th Street Wraps Up Construction in Mott Haven, The Bronx, New York YIMBY, Feb 2, 2026.