# 290 East 149th Street, The Bronx

Apartment building · 164 units · built 2024 · Block 2330, Lot 16.

On Umarelli: https://umarelli.org/nyc/2023300016/290-east-149-street

More construction in Mott Haven and Port Morris: https://umarelli.org/nyc/bronx/mott-haven-and-port-morris.md

## Building permits

- Alteration, filed Feb 5, 2026, estimated cost $201K, described as “Interior partition wall renovation: no change of use, egress, floor area, footprint, and strusture. No vertical / horizontal extension and enlargement. No change in envelope or any item affecting the energy of the bldg.”
- Alteration, filed Feb 5, 2026, estimated cost $1K, described as “Non-illuminated non-advertising accessory wall sign - marci parking. No change of use, egress or occupancy.”
- Alteration, filed Jan 29, 2026, estimated cost $10K, described as “Installation of 15 LF Curb Cut in conjunction with NB # 210178948.”
- Alteration, filed Nov 3, 2025, estimated cost $30K, described as “General construction for I-4 daycare use, ages 0-13, 58 children and 19 adults.”
- Alteration, filed Sep 25, 2024, estimated cost $190K, described as “Installation of 52.8 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Aug 7, 2024, estimated cost $150K, described as “Installation of Gas Generator on Roof in conjunction with New Building # 210178948. No change in egress, use, occupancy, or zoning.”
- Alteration, filed May 14, 2024, estimated cost $1.0M, described as “Super-Structure for New Ten (10) Story Mixed Use Dwelling.”
- Alteration, filed Feb 5, 2024, estimated cost $10K, described as “Installation of a single personnel/material hoists. Car # 1 shall be 6000# capacity during new building const filed sep. Hoists shall comply with the 2022 bldg codes, ch #33. No change in use, occ or egress under this app elev appl filed…”
- Alteration, filed Feb 5, 2024, estimated cost $10K, described as “Installation of a single personnel/material hoists. Car # 2 shall be 7000# capacity during new building const filed sep. Hoists shall comply with the 2022 bldg codes, ch #33. No change in use, occ or egress under this app elev appl filed…”
- Alteration, filed Jun 14, 2023, estimated cost $1K, described as “Foundation/Earthwork for the New Building filed under NB 210178948. No change in egress use or occupancy.”
- Alteration, filed Jun 14, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, roof protection, and overhead protection as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 14, 2023, estimated cost $20K, described as “Temporary construction fence”
- Alteration, filed Jan 20, 2023, estimated cost $1K, described as “Filing for installation of plumbing systems in new building filed under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $1K, described as “Installation of Mechanical Systems filed in conjunction with New Building work under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $2K, described as “Installation of Sprinkler-Standpipe System in conjunction with New Building # 210178948. No change in egress use or occupancy.”
- Alteration, filed Jan 19, 2023, estimated cost $1K, described as “Installation of Temporary Standpipe System in conjunction with New Building filing under NB # 210178948. No change in egress use or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 27, 2022, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence to protect site, during full demolition”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence, to protect site during full demolition.”
- Alteration, filed Apr 19, 2022, estimated cost $3K, described as “Installation of construction fence to protect site during full demolition”
- Alteration, filed Apr 12, 2022, estimated cost $5K, described as “Installation of temporary overhead protection at adjacent property during bldg demolition, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 23, 2021, estimated cost $7K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”

## Property taxes

- Assessment: $9,175,050
- 2026–27 tax: $119,439
- Market value (city estimate): $20,389,000
- Taxable value: $1,050,626
- Assessed land: $1,017,450
- Assessed improvements: $8,157,600

## Tax breaks

- Article XI exemption, through Jun 30, 2063, about $993,989 a year below the full tax.
- Solar abatement, through Jun 30, 2030, a $11,249 credit this tax year.

## Zoning

C4-4: floor area ratio 4.93 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 26, 2020: $1,150,000, 2,880 sq ft ($399 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.