121 East 144th Street, The Bronx
Apartment building · 206 units · built 2021 · Block 2350, Lot 1.
Building permits
- Alteration, filed May 17, 2024, estimated cost $150K, described as “It is proposed to renovate two commercial spaces on the first floor and cellar and install a new convenience stair as shown on plans. No change to use egress or occupancy. This application is filed in-conjunction with NB appl. 220613735.”
- Alteration, filed Jan 25, 2022, estimated cost $3K, described as “Installation of temporary netting as per drawings. Temporary netting shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 1, 2021, estimated cost $3K, described as “Installation of temporary roof protection at adjacent property during new bldg const, filed sep. Roof protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 29, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2021, estimated cost $20K, described as “Installation of dual 6000# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elev appl sub to elev dept.”
- Alteration, filed Sep 28, 2021, estimated cost $15K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Shed legs on roadway. Dot permits by others.”
- Alteration, filed Feb 10, 2021, estimated cost $56K, described as “Installation of construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.. Dot permits by others for fence installed on sidewalk / roadway.”
- Alteration, filed Nov 23, 2020, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Oct 8, 2020, estimated cost $10K, described as “It is proposed to file for temp standpipe work as shown on plans. This application is filed in conjunction with NB application 220613735”
- Alteration, filed Oct 5, 2020, estimated cost $1K, described as “It is proposed to install a new curb cut filed in conjunction with NB appl 220613735.”
- Alteration, filed Aug 20, 2020, estimated cost $3K, described as “It is proposed to file for sprinkler & standpipe work in-conjunction with NB appl. 220613735. See comments below regarding fees”
- Alteration, filed May 16, 2018, estimated cost $325, described as “Installation of temporary plywood construction fence”
Property taxes
- Assessment
- $17,286,300
- 2026–27 tax
- $51,889
- Market value (city estimate)
- $38,414,000
- Taxable value
- $417,150
- Assessed land
- $503,100
- Assessed improvements
- $16,783,200
Tax breaks
- 421-a exemption, through Jun 30, 2059, about $2,098,354 a year below the full tax.
Zoning
M1-4/R8A: floor area ratio 9.40 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 18, 2019: $11,550,000
- Jan 14, 2016: $6,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- HOSTOS COMMUNITY COLLEGE REZONING (City Planning P1997X0332): Zoning map change, Completed, decided Oct 20, 1997. 97DCP045X; DCP IS PROPOSING TO REZONE THREE SECTIONS, NORTH, EAST, AND SOUTH OF THE INTERSECTION OF EAST 149TH STREET AND THE GRAND CONCOURSE
In the news
Affordable Housing Lottery Launches for The Estela at 414-445 Gerard Avenue in Mott Haven, The Bronx, New York YIMBY, Jul 15, 2023.