# 575 Exterior Street, The Bronx

Condominium · 541 units · built 2021 · Block 2356, Lot 7501.

On Umarelli: https://umarelli.org/nyc/2023567501/575-exterior-street

More construction in Melrose and Concourse: https://umarelli.org/nyc/bronx/melrose-and-concourse.md

## Building permits

- Alteration, filed Oct 9, 2026, estimated cost $13K, described as “Modifications to Existing Sprinkler System on Part of 1st Floor Within Existing Retail Tenant Space”
- Alteration, filed Aug 17, 2026, estimated cost $300K, described as “Interior alterations of existing commercial tenant space to include partition and finishes work. No change to use, occupancy or egress”
- Alteration, filed May 9, 2025, estimated cost $10K, described as “Installation of temporary scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed May 9, 2025, estimated cost $10K, described as “Installation of temporary material hoist as per plans during general construction work. No change in use, egress or occupancy. Material hoist to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jan 7, 2025, estimated cost $14.0M, described as “Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. Filed in conjunction wth hub NB #210179929. (hub consultation 9/5/24. S pavan ok to assign to s linehan examiner)”
- Alteration, filed Oct 16, 2023, estimated cost $1K, described as “Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Oct 9, 2023, estimated cost $15K, described as “41'x66' temporary tent for an event. To be installed on 10/16, used on 10/19, and removed on 10/21.”
- Alteration, filed Dec 8, 2022, estimated cost $1K, described as “Installation and use of temporary suspended scaffolding as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 12, 2022, estimated cost $2K, described as “Installation of construction plywood fence & chain-link fence as per plans. Fence shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 6, 2022, estimated cost $1K, described as “Installation and use of temporary mobile equipment as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Aug 30, 2022, estimated cost $1K, described as “Supported Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Aug 18, 2022, estimated cost $1K, described as “Filing herewith installation of boilers in conjunction with NB application 210179929.”
- Alteration, filed Mar 17, 2022, estimated cost $1K, described as “Installation and use of temporary loading platform k as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 28, 2021, estimated cost $1K, described as “EZ Scale scaffold installation as per plans filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Oct 4, 2021, estimated cost $10K, described as “Installation of temporary overhead protection at adjacent properties during NB cons, filed sep. Temporary overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 4, 2021, estimated cost $20K, described as “Southeast-cars 3&4: installation of dual 7000 # capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator…”
- Alteration, filed Oct 4, 2021, estimated cost $20K, described as “Southwest-cars 1&2: installation of dual 7000 # capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator…”
- Alteration, filed Sep 14, 2021, estimated cost $1K, described as “Installation and use of temporary interior climbing platforms as per plan filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 13, 2021, estimated cost $1K, described as “Installation and use of temporary loading platforms as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 26, 2021, estimated cost $1K, described as “Installation and use of alternate protection system as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Jul 20, 2021, estimated cost $1K, described as “Installation and use of temporary platform as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 1, 2021, estimated cost $1K, described as “Installation and use of concrete placing boom as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 1, 2021, estimated cost $1K, described as “Installation and use of concrete placing boom as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Apr 21, 2020, estimated cost $5K, described as “Installation of construction fence as per plans. Construction fence shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Sep 18, 2019, estimated cost $1K, described as “Installation of a temporary standpipe with pressurization alarm system”

## Property taxes

- Assessment: $44,929,649
- Market value (city estimate): $99,843,666
- Taxable value: $0
- Assessed land: $679,950
- Assessed improvements: $44,249,699
- Condo units with their own tax lots: 7

## Tax breaks

- EDC PILOT, with no end date.

## Zoning

R7-2: floor area ratio 4.16 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29).

## In the news

[Developers Celebrate the Opening of Bronx Point at 575 Exterior Street in The South Bronx](https://newyorkyimby.com/2023/11/developers-celebrate-the-opening-of-bronx-point-at-575-exterior-street-in-the-south-bronx.html), New York YIMBY, Nov 3, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
