721 Walton Avenue, The Bronx
Apartment Building · 120 units · built c. 1927 · Block 2473, Lot 48.
Building permits
- Alteration, filed Mar 20, 2026, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Aug 15, 2024, estimated cost $375K, described as “Filing for facade restoration work that includes replacement and/or repair of masonry parapet walls, replacement of terracotta sills, replacement of steel lintels, repair of mortar joints, and misc brick masonry repairs, etc. as shown on…”
- Alteration, filed Apr 19, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
Building history
- Major Renovation — Conversion, filed Aug 9, 2002, signed off Feb 27, 2003, 119 units added, 6 stories, described as “Misc.renovations to 44 apts. Including gyp.bd lamination of walls. Replacement of finishes, fixtures & floor joist including branch piping in bath & kitchens. Divide APT#4 on the 4TH fl. Creating additional apt.,#3X. Also misc.…”
- Major Renovation — Conversion, filed Dec 8, 2000, permit issued - entire job/work, 98 units added, 6 stories, described as “Eliminate rear exists to gerard ave.main tain required two means of egr s provided to streets under application 200626439.no change in use or occupancy.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $2,501,550
- 2026–27 Tax
- $311,168
- Market value (city estimate)
- $5,559,000
- Taxable value
- $2,501,550
- Assessed land
- $135,000
- Assessed improvements
- $2,366,550
Zoning
R8: floor area ratio 3.73 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Grand Concourse Historic District (Historic District). 5 Landmarks Preservation Commission permits are on file.