## Building permits

- Alteration, filed Apr 30, 2026, estimated cost $500K, described as “Removal of 1 story building above grade.”
- Demolition, filed Oct 14, 2025, estimated cost $456K, described as “Demolish a one story Temporary Classroom Building located at PS 073 Bronx. The Temporary Classroom Building was constructed in 1972. It is being removed to make way for an upgraded playground for the school.”
- Alteration, filed Mar 27, 2024, estimated cost $1.9M, described as “Redevelopment of the playground including new play equipment, learning panels and safety surface. Installation of planters. Repaving site with asphalt pavement.”
- Alteration, filed Aug 30, 2023, estimated cost $20K, described as “Soe/PS73X - for temporary support of excavation submitting on behalf of contractor, related with DOB job #X00678506., X00887195 no change in use, occupancy or egress”
- Alteration, filed Jul 10, 2023, estimated cost $20K, described as “Sh/PS73X - for temporary construction equipment(shed) submitting on behalf of contractor, related with DOB job #X00678506. No change in use, occupancy or egress”
- Alteration, filed Jul 10, 2023, estimated cost $20K, described as “Sf/PS73X - for temporary construction equipment(scaffold) submitting on behalf of contractor, related with DOB job #X00678506. No change in use, occupancy or egress”
- Alteration, filed Jul 10, 2023, estimated cost $20K, described as “Fn/PS73X - for temporary construction equipment(fence) submitting on behalf of contractor, related with DOB job #X00678506. No change in use, occupancy or egress”
- Alteration, filed Mar 7, 2022, estimated cost $34K, described as “Submitted on behalf of contractor for the installation of temporary emergency construction equipment (shed - 70 lf), in conjunction with llw# 127925. No change in use, occupancy or egress.”
- Alteration, filed Feb 16, 2022, estimated cost $2.5M, described as “Work includes per the filed plans addition of elevator serving floors 1 - 5, provide accessible ramps to upper/lower yards, provide new accessible toilet rooms, wheelchair lift to mezzanine/3rd fl, addition of areas of rescue assistance at…”

## Property taxes

- Assessment: $5,240,250
- Market value (city estimate): $11,645,000
- Taxable value: $0
- Assessed land: $435,600
- Assessed improvements: $4,804,650

## Zoning

R7-1: floor area ratio 1.82 built, 3.44 allowed by base zoning.