1144 Nelson Avenue, The Bronx
Apartment building · 33 units · built c. 1926 · Block 2513, Lot 50.
Building permits
- Alteration, filed Aug 18, 2021, estimated cost $290K, described as “Replacement of existing roof in kind, all structure to remain the same. Repair of existing parapet in kind, in same location as indicated on plans. No change in use, egress or occupancy under this application”
- Alteration, filed Apr 20, 2021, estimated cost $1.4M, described as “Interior renovation of existing building, replacement of kitchen fixtures and appliances, replacement of d.u light fixtures, new finishes. Facade replacment of brick, stucco and lintels as needed. No change in use, egress, or occupancy…”
- Alteration, filed Apr 8, 2021, estimated cost $6K, described as “Installation of heavyduty sidewalk shed for remedial repairs. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Oct 30, 2018, estimated cost $8K, described as “Installation of heavyduty sidewalk shed for remedial repairs. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Apr 13, 2018, estimated cost $18K, described as “Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live LOAD300 per square feet.…”
Property taxes
- Assessment
- $933,750
- Market value (city estimate)
- $2,075,000
- Taxable value
- $0
- Assessed land
- $49,500
- Assessed improvements
- $884,250
Zoning
R7-1: floor area ratio 3.53 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- HIGHBRIDGE REHABILITATION PROJECT (City Planning P1989X0064): Completed, decided Sep 14, 1989. UDAAP & DISPO BY NYCHA TO REHABILITATE 7 BLDGS WITH 215*UNITS OF PUBLIC HOUSING UNDER THE TURNKEY METHOD
- HIGHBRIDGE REHABILITATION PROJECT (City Planning P1989X0679): Completed, decided Sep 14, 1989. P&P TO REHAB 215 UNITS OF HOUSING IN 5 & 6-STORY BLDGS FOR*LOW-INCOME FAMILIES