# 1181 Nelson Avenue, The Bronx

Community Center · built 1973 · Block 2516, Lot 51.

On Umarelli: https://umarelli.org/nyc/2025160051/1181-nelson-avenue

More construction in Highbridge and Morris Heights: https://umarelli.org/nyc/bronx/highbridge-and-morris-heights.md

Every lot on block 2516: https://umarelli.org/nyc/bronx/2516.md

## Building permits

- Alteration, filed Sep 12, 2024, estimated cost $6K, described as “Installation of sidewalk shed as per plans in conjunction with job #X00674129. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 7, 2024, estimated cost $219K, described as “Filing herewith for mechanical work related to the interior repair and maintenance of the existing space. There will be no change in egress, occupancy and use.”
- Alteration, filed Apr 4, 2024, estimated cost $215K, described as “Filing herewith for the installation of new fence and related civil work. There will be no change in egress, occupancy or use.”
- Alteration, filed Apr 4, 2024, estimated cost $30K, described as “Filing herewith for the plumbing work related to the interior repair and maintenance of the existing space. There will be no change in egress, occupancy or use.”
- Alteration, filed Mar 30, 2023, estimated cost $472K, described as “Filing herewith for the maintenance and repair of the existing space. There will be no change in egress, occupancy or use.”
- Alteration, filed Jul 25, 2022, estimated cost $5K, described as “Installation of 300psf sidewalk shed as per plans. Sidewalk shedt shall comply with chapter #33 of the 2014 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jan 31, 2022, estimated cost $75K, described as “Filing herewith applicaiton for structural work type. No change in use, egress, or occupnacy.”
- Alteration, filed Dec 28, 2021, estimated cost $300K, described as “Filing herewith application ofmechanical work type. No change in use, egress, or occupancy.”
- Alteration, filed Dec 28, 2021, estimated cost $15K, described as “Filing herewith application for plumbing and sprinkler worktypes. No change in use, egress, or occupancy.”
- Alteration, filed Nov 24, 2021, estimated cost $720K, described as “Filing herewith application for interior and exterior renvoations, no change in use, egress, or occupancy.”

## Building history

- Alteration, filed Mar 12, 1993, plan exam - disapproved, described as “Install a new fire suppression system on 2ND floor kitchen. All other work on 1ST floor was completed under bn 299/87.application is submitted to obtain a new c. O.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $1,646,550
- 2026–27 Tax: $170,062
- Market value (city estimate): $3,659,000
- Taxable value: $1,566,090
- Assessed land: $67,050
- Assessed improvements: $1,579,500

## Zoning

R7-1: floor area ratio 1.93 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Highbridge Advisory Council CCC (continued use) (City Planning P2012X0197): Completed, decided Aug 20, 2012. This is a public application by the Administration of Children's Services (ACS), the Department for the Aging, and the Department of Citywide Administrative Services (DCAS) to approve the acquisition of property (C120140 PQX) at 1181…
- HIGHBRIDGE DCC/SR CENTER (City Planning P1992X0099): Completed, decided Oct 23, 1992. ACQUISITION OF A 3-STORY BLDG TO CONTINUE TO OPERATE A DAY\*CARE CENTER FOR 235 CHILDREN & A SR CENTER FOR 105 CLIENTS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
