# 980 East 149th Street, The Bronx

Industrial · built 2022 · Block 2599, Lot 87.

On Umarelli: https://umarelli.org/nyc/2025990087/980-east-149-street

More construction in Mott Haven and Port Morris: https://umarelli.org/nyc/bronx/mott-haven-and-port-morris.md

## Building permits

- New Building — Non-residential, filed May 3, 2021, 5 stories, described as “5 story warehouse & commercial vehicle storage bldg. Zoning/egress filed under this application for the entire bldg. Architectural plans for warehouse portion only filed under this document. Architectural plans for garage under subsequent…”
- Alteration, filed Jul 19, 2023, estimated cost $4K, described as “Use of scissor lift during new building construction, filed separately under X00513466”
- Alteration, filed Jul 5, 2023, estimated cost $66K, described as “Erect (2) non-illuminated accessory banner signs for bronx logistic center.”
- Alteration, filed May 24, 2023, estimated cost $2K, described as “Use of scissor lift during new building construction, filed separately under X00513466”
- Alteration, filed May 24, 2023, estimated cost $18K, described as “Erect non-illuminated banner on wall.”
- Alteration, filed May 24, 2023, estimated cost $2K, described as “Use of telehandler during new building construction, filed separately under X00513466”
- Alteration, filed May 15, 2023, estimated cost $2K, described as “Use of mini crane during new building construction, filed separately under X00513466”
- Alteration, filed Oct 24, 2022, estimated cost $5.9M, described as “Install 6624 solar panels 2947.68kw on a flat roof using Terrasmart rooftop carport canopy system with Longi LR4-72HBD-445M panels. No change in use, egress or occupancy.”
- Alteration, filed Sep 20, 2022, estimated cost $5.1M, described as “Construct solar carport on top of parking garage, no change in use, egress or occupancy.”
- Alteration, filed Sep 15, 2022, estimated cost $5K, described as “Installation of temporary debris chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 13, 2022, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 2, 2022, estimated cost $5K, described as “Erect 3 real estate banners on east 149TH street elevation and 1 real estate banner on bruckner blvd elevation”
- Alteration, filed Apr 4, 2022, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 1, 2022, estimated cost $300K, described as “Bronx Logistics - Filing for temporary Standpipe during construction.”
- Alteration, filed Jan 28, 2022, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 19, 2021, estimated cost $1K, described as “Application filed for methane mitigation system in conjunction with NB Construction. No change in use, egress or occupancy.”
- Alteration, filed Aug 26, 2021, estimated cost $1K, described as “Sprinkler/standpipe work in conjunction with NB Construction. NB filed under X00513466.”
- Alteration, filed Aug 11, 2021, estimated cost $1K, described as “Installation of 52.5 foot curb cut including 2.5' splays on each side. Filed in conjunction with NB# X00513466-I1”
- Alteration, filed Aug 11, 2021, estimated cost $1K, described as “Installation of 30 foot curb cut including 2.5' splays on each side. Filed in conjunction with NB# X00513466-I1”
- Alteration, filed Aug 11, 2021, estimated cost $1K, described as “Installation of 50 foot curb cut including 2.5' splays on each side. Filed in conjunction with NB# X00513466-I1”
- Alteration, filed Jul 22, 2021, estimated cost $1K, described as “Ground improvement work in conjunction with NB Construction. NB Filed under X00513466.”
- Alteration, filed Mar 19, 2021, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 12, 2021, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 12, 2021, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $60,964,650
- 2026–27 tax: $1,322,394
- Market value (city estimate): $135,477,000
- Taxable value: $59,971,500
- Assessed land: $9,532,800
- Assessed improvements: $51,431,850

## Tax breaks

- ICAP abatement, through Jun 30, 2050, a $5,183,315 credit this tax year.

## Zoning

M3-1: floor area ratio 1.91 built, 2.00 allowed by base zoning.

## Recent sales

- Dec 21, 2018: $57,050,025

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 14 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).

## Board and land use applications

- BRUCKNER BLVD-E149ST URP (City Planning P1997X0153): Completed, decided May 19, 1997. 1ST AMENDED BRUCKNER BLVD-E149 ST URP TO PERMIT (CON AGG)\*CONCRETE RECYCLING WITHIN THE URA & ON THE SITE WHILE\*CONTINUING PROHIBIT ALL OTHER UG 18 USES
- CON-AGG RECYCLING CORP (City Planning P1985X0787): Completed, decided Aug 15, 1985. 85-118X: DISPOSITION BY PDC OF APPROX. 266,000 SQ. FT. OF LAND WITHIN THE BRUCKNER BLVD. EAST 149 ST. URA TO CON-AGG.

## In the news

[Permits Filed for 980 East 149th Street in Port Morris, The Bronx](https://newyorkyimby.com/2024/08/permits-filed-for-980-east-149th-street-in-port-morris-the-bronx.html), New York YIMBY, Aug 29, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
