330 Bruckner Boulevard, The Bronx
Industrial · built c. 1929 · Block 2599, Lot 165.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jul 22, 2024, described as “Renewal of SR 19/2875”
- Alteration, filed Aug 24, 2022, estimated cost $84K, described as “Installation of DISH telecommunications site on ROOF. No change to use, egress, or occupancy. Install (3) antenna sectors, (6) RRH units, (1) GPS unit, and platform on ROOF. All in compliance with TPPN 5/98. PAA TO REVISE RRH…”
- Alteration, filed Jul 28, 2022, estimated cost $50K, described as “Wall remediations to newly installed facade as per plans filed herewith. There will be no change in use, egress, or occupancy.”
- Alteration, filed May 9, 2022, estimated cost $10K, described as “HVAC modification and associated ductwork as per plans. There will be no change in use, egress, or occupancy.”
- Alteration, filed Jan 6, 2022, estimated cost $46K, described as “Additional sprinkler coverage per sheet metal storage cubicals”
- Alteration, filed Dec 2, 2021, estimated cost $52K, described as “Installation of gas fired unit heaters. No change in use, egress, or occupancy.”
- Alteration, filed Dec 2, 2021, estimated cost $35K, described as “Installation of gas fired unit heaters, gas riser, and associated gas piping. No change in use, egress, or occupancy.”
- Alteration, filed Apr 19, 2021, estimated cost $38K, described as “HVAC modifications and associated duct work as per plans filed herewith. There will be no change in use, egress or occupancy”
- Alteration, filed Apr 5, 2021, estimated cost $200K, described as “Renovation of existing offices and addition of metal panel cladding to the facade. There is no change to use egress or occupancy”
- Alteration, filed May 15, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 13, 2019, estimated cost $150, described as “Install illuminated wall sign (location: extra space storage - wording: office)”
- Alteration, filed May 13, 2019, estimated cost $250, described as “Install illuminated wall sign (location: extra space storage - wording: loading)”
- Alteration, filed May 13, 2019, estimated cost $250, described as “Install illuminated wall sign (location: extra space storage - wording: loading)”
- Alteration, filed May 13, 2019, estimated cost $250, described as “Install illuminated wall sign (location: extra space storage - wording: loading)”
- Alteration, filed May 13, 2019, estimated cost $3K, described as “Install illuminated wall sign (extra space storage)”
- Alteration, filed May 10, 2019, estimated cost $13K, described as “Install illuminated wall sign (extra space storage)”
- Alteration, filed May 10, 2019, estimated cost $4K, described as “Install indirectly illuminated wall sign (extra space storage).”
- Alteration, filed May 10, 2019, estimated cost $10K, described as “Install illuminated wall sign (extra space storage)”
- Alteration, filed Oct 4, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $18,039,150
- 2026–27 tax
- $1,564,494
- Assessed land
- $453,150
- Assessed improvements
- $17,586,000
Zoning
M3-1: floor area ratio 4.97 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Appeal (Board of Standards and Appeals 68-13-A): Appeal, Denied, filed Feb 13, 2013, decided Jan 28, 2014. Appeal challenging Department of Buildings’ determination that the existing sign is not entitled to non-conforming use status. M3-1 zoning district.