# 19-19 Hazen Street, The Bronx

Jail or Prison · built c. 1933 · Block 2605, Lot 40.

On Umarelli: https://umarelli.org/nyc/2026050040/19-19-hazen-street

More construction in Hunts Point: https://umarelli.org/nyc/bronx/hunts-point.md

Every lot on block 2605: https://umarelli.org/nyc/bronx/2605.md

## Building permits

- Alteration, filed Jan 22, 2025, estimated cost $10K, described as “Installation of 1409 SF canopy as indicated on plans. No change in use, egress, or occupancy. Structural & Foundation scope of work filed under subsequent application.”
- Alteration, filed Dec 13, 2024, estimated cost $10K, described as “Support of excavation associated with installation of underground storage tanks. No change in use, egress or occupancy.”
- Alteration, filed Jul 8, 2022, estimated cost $5.0M, described as “General construction alterations on the 1st floor & cellar level for proposed upgrades to existing locker rooms and restrooms; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jul 7, 2022, estimated cost $6.2M, described as “General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed upgrades to existing locker rooms and HVAC systems. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jul 7, 2022, estimated cost $292K, described as “General construction alterations on the 1st thru 2nd floors, mezzanine, and roof level for proposed upgrades to existing HVAC equipment; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jul 7, 2022, estimated cost $5.9M, described as “General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed renovation of Young Adult Program Spaces; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jun 30, 2022, estimated cost $2.0M, described as “General construction alterations on the 1st floor, cellar, and roof level for proposed locker room upgrades; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jun 30, 2022, estimated cost $3.2M, described as “General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Jun 30, 2022, estimated cost $1.3M, described as “General construction alterations on the 1st floor, mezzanine, and roof levels for proposed renovation of Central Program Unit 6A; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Oct 29, 2021, estimated cost $1.1M, described as “Remove two (2) 4,000-gallon usts, fueling equip, canopy as shown on plans. Install two (2) 8,000-gallon dw frp diesel & gas usts and fueling system. Complete upgrades to usts 8,9,10 as shown on plans. No change to use or egress.”
- Alteration, filed Aug 13, 2021, estimated cost $8.8M, described as “Catwalks for Surge Tanks are supported from floor/ground independent of any building and equipment support structure.”
- Alteration, filed Aug 13, 2021, estimated cost $9.0M, described as “RIKERS- POWERHOUSE\_ AKA 16-16 Hazen Street: Upgrade of Boiler feed water treatment system. All as per plans filed herewith.”
- Alteration, filed Jul 12, 2021, estimated cost $10.0M, described as “Exterior facade & roof repairs as per the plans filed including: Removal & replacement of existing roof membrane, flashing, cracked masonry units & copings. Scraping & painting of existing steel lintels. Parapet railing installation.”
- Alteration, filed Jul 8, 2021, estimated cost $1.6M, described as “Herewith filing of application for civil,architectural and structural work consisting of minimal interior horizontal enlargement of 778 sq.ft. Exterior renovations limited to site work as indicated on plans filed herein.no change in use or…”
- Alteration, filed Jun 23, 2021, estimated cost $381K, described as “Herewith filing of general construction for civil work to repair sidewalks and adaaccesible ramp as per drawings filed herein.”
- Alteration, filed Jun 16, 2021, estimated cost $9.2M, described as “Rikers Island Steam Tunnel Rehabilitation work. All as per plans filed herewith.”
- Alteration, filed May 27, 2021, estimated cost $1.9M, described as “Nicc- repair and upgrade of methane mitigation and detection system. All as per plans filed herewith.”
- Alteration, filed May 27, 2021, estimated cost $1.9M, described as “Obcc- repair and upgrade of methane mitigation and detection system. All as per plans filed herewith.”
- Alteration, filed May 25, 2021, estimated cost $10.5M, described as “Herewith filing of mechanical appliation for modification on the existing heating and cooling system as reflected on the drawings.no change in use, egress or occupancy filed under this application.\_(rmsc\_reno|package #2)”
- Alteration, filed May 21, 2021, estimated cost $15.4M, described as “Here with Filing general construction work consists of interior and exterior work as indicated on plans”
- Alteration, filed May 21, 2021, estimated cost $441K, described as “Herewith filing of general ot application for minor structural modifications including supporting foundation and installation of temporary trailers for locker room as indicated on the drawings filed herein. No change in use, egress or…”
- Alteration, filed May 20, 2021, estimated cost $1.7M, described as “Herewith filing of sprinkler application for modifications of existing fire protection system as reflected on the drawings filed herein. No change in use, egress or occupancy filed under this application.\_(rmsc\_reno|package #2)”
- Alteration, filed May 20, 2021, estimated cost $3.4M, described as “Herewith filing of plumbing application for installation of new fixtures such as new sinks, toilets, etc; as reflected on the drawings filed herein. No change in use, egress or occupancy filed under this application.\_(rmsc\_reno|package #2)”
- Alteration, filed May 5, 2021, estimated cost $150K, described as “Herewith filing to install (1) New Water Dis-Infection Copper Silver Ionization system for the domestic hot water system at the EMTC Locker room- system to be bolted to existing concrete. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2021, estimated cost $900K, described as “Gmdc-central storage bldg- repair and upgrade of methane mitigation and detection system. All as per plans filed herewith.”

10 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/2026050040/19-19-hazen-street.

## Building history

- New Building, filed Jul 17, 2020, plan exam - disapproved, 1 story, described as “Installation of new prefab modular building as per plans.”
- New Building — Non-residential, filed Sep 12, 2011, signed off Nov 17, 2016, 2 stories, described as “Application filed for a new one story and mezzanine building (cogeneration plant)”
- Demolition, filed May 19, 2008, permit issued - entire job/work, units 1 to 0, stories 1 to 0, described as “Demolition of modular structure”
- Demolition, filed May 19, 2008, permit issued - entire job/work, units 1 to 0, stories 1 to 0, described as “Demolition of modular structure”
- Demolition, filed May 19, 2008, permit issued - entire job/work, units 1 to 0, stories 1 to 0, described as “Demolition of modular structure”
- Demolition, filed May 19, 2008, permit issued - entire job/work, units 1 to 0, stories 1 to 0, described as “Demolition of modular structure”
- New Building — Non-residential, filed Mar 22, 2006, signed off Dec 16, 2011, 5 stories
- New Building — Non-residential, filed May 11, 2005, plan exam - approved, 2 stories
- Demolition, filed May 4, 2005, signed off Jun 15, 2005, stories 1 to 0
- New Building — Non-residential, filed Oct 26, 2004, permit issued - partial job, 2 stories

The 10 most recent of 19 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $532,990,800
- Market value (city estimate): $1,184,424,000
- Taxable value: $0
- Assessed land: $87,499,350
- Assessed improvements: $445,491,450

## Zoning

C8-2: floor area ratio 0.31 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Rikers Island Public Place Mapping (City Planning 2020Y0245): City Map Change, Completed, decided Apr 26, 2022. The establishment of Public Place on Rikers Island.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology