1120 Union Avenue, The Bronx
Apartment Building · 36 units · built 1986 · Block 2680, Lot 13.
Building permits
- Alteration, filed Feb 2, 2024, estimated cost $2K, described as “Removal and replacement of gas riser, heating and domestic distribution system as part of tenant in place moderate rehabilitation. No change in egress , use , or occupancy.”
- Alteration, filed Feb 2, 2024, estimated cost $12K, described as “Removal and replacement of gas riser, heating and domestic distribution system as part of tenant in place moderate rehabilitation. No change in egress , use , or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $12K, described as “Renovation of Mechanical Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $2K, described as “Renovation of Mechanical Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use or occupancy.”
- Alteration, filed Nov 22, 2023, estimated cost $2K, described as “Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.”
- Alteration, filed Nov 22, 2023, estimated cost $12K, described as “Renovation of Plumbing Systems as part of Tenant-in-Place Mod Rehab. No change in egress, use, or occupancy.”
- Alteration, filed Oct 31, 2023, estimated cost $20K, described as “Installation of two (2) gas-fired boilers in cellar. No change in egress, use, or occupancy.”
- Alteration, filed Oct 31, 2023, estimated cost $30K, described as “Installation of three (3) gas-fired boilers in cellar. No change in egress use, or occupancy.”
- Alteration, filed Sep 19, 2023, estimated cost $42K, described as “Facade repair as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Sep 19, 2023, estimated cost $32K, described as “Facade repair as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Aug 14, 2023, estimated cost $16K, described as “Filing plans for Tenant-in-Place roof re-cover over existing to remain. no change in use egress or occupancy”
- Alteration, filed Aug 14, 2023, estimated cost $76K, described as “Filing plans for Tenant-in-Place roof re-cover over existing to remain. no change in use egress or occupancy”
- Alteration, filed Jun 18, 2023, estimated cost $270K, described as “Moderate Tenant-in-Place Interior Apartment Renovation to include the removal and replacement of Kitchen Cabinets appliances and countertops, Bathroom Fixtures and finishes , new lighting, and finishes. No change in egress, use or…”
- Alteration, filed Jun 13, 2023
Property taxes
- Assessment
- $919,350
- Market value (city estimate)
- $2,043,000
- Taxable value
- $0
- Assessed land
- $263,700
- Assessed improvements
- $655,650
Zoning
R6: floor area ratio 0.88 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- WOODSTOCK/167TH ST CLOSING (City Planning P1989X0193): Completed, decided Sep 19, 1990. 89-070X: CLOSE E167TH ST BET UNION & PROSPECT AVE