# 221D Manida Street, The Bronx

Utility · Block 2777, Lot 100.

On Umarelli: https://umarelli.org/nyc/2027770100/221d-manida-street

More construction in Hunts Point: https://umarelli.org/nyc/bronx/hunts-point.md

Every lot on block 2777: https://umarelli.org/nyc/bronx/2777.md

## Building permits

- Alteration, filed Jun 9, 2023, estimated cost $1K, described as “Installation of scaffold stair tower for worker access during construction. Scaffold shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Dec 30, 2022, estimated cost $10.0M, described as “Herewith filing for temporary support of excavation system for the digester facility. System consists of soldier piles with wood lagging.no change in use, egress or occupancy with this filing.”
- Alteration, filed Mar 15, 2022, estimated cost $15.6M, described as “The hp-238 hunts point new anaerobic digester facilities project includes construction of digestor control and gas building, below grade equipment gallery, and four 92-ft inside dia. Silo shape digesters with concrete foundations.”
- Alteration, filed Feb 14, 2022, estimated cost $40K, described as “The HP-238 Hunts Point Wastewater Treatment Plant New Anaerobic Digester Facilities project includes construction of new single-story digester control building, gas building, and 4 sludge digesters including construction fencing.”
- Alteration, filed Jan 20, 2022, estimated cost $36.0M, described as “The Hunts Point Wastewater Treatment Plant New Anaerobic Digester Facilities project includes excavation, site grading, construction of access roads, sidewalks, curbs, installation of utilities (storm, sanitary, water, gas, electrical) and…”
- Alteration, filed Aug 19, 2021, estimated cost $16.4M, described as “Equipment gallery ventilation and heating. Control Building heating, cooling and ventilation. Gas room heating and ventilation.”
- Alteration, filed Aug 19, 2021, estimated cost $580K, described as “Provide domestic piping for water heater and associated plumbing fixtures. Sanitary piping for associated plumbing fixtures. Storm drainage piping for roof drains. Make-up water connections to hydronic systems.”
- Alteration, filed Aug 9, 2021, estimated cost $10.0M, described as “Analysis and design of steel walkways and stair towers for access to digester tank roofs including steel design of all elements and connections and design and detailing/development of drawings.”
- Alteration, filed Aug 6, 2021, estimated cost $15.6M, described as “Cast-in-place, concrete equipment gallery. Gas room/control building made from cast-in-place concrete structural framing with masonry infill walls. Overhead steel gas pipe supports. Cast-in-place, post-tensioned concrete, steel framed…”
- Alteration, filed Jan 12, 2021, estimated cost $40K, described as “Elevator ventilation and heating.”

## Property taxes

- Assessment: $5,165,550
- Market value (city estimate): $11,479,000
- Taxable value: $0
- Assessed land: $5,165,550

## Zoning

M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- HUNTS PT WATER POLLUTION CON PLANT (City Planning P2007X0008): Completed, decided Sep 17, 2007. 05DEP023X: NYC DEP, ON BEHALF OF THE CITY OF NEW YORK IS PROPOSING TO M AKE IMPROVEMENTS TO THE HUNTS POINT WATER POLLUTION CONTROL PLANT

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
