# 1260 Ryawa Avenue, The Bronx

Utility · Block 2780, Lot 2.

On Umarelli: https://umarelli.org/nyc/2027800002/1260-ryawa-avenue

More construction in Hunts Point: https://umarelli.org/nyc/bronx/hunts-point.md

Every lot on block 2780: https://umarelli.org/nyc/bronx/2780.md

## Building permits

- Alteration, filed Oct 1, 2025, estimated cost $1K, described as “Installation of system scaffolding in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Nov 27, 2024, estimated cost $1.9M, described as “Dep hunts point wrrf, main building, NYC wastewater resiliency program assignment rlcy-hp-02-J18G-f-07. Remove & replace exist conduit & wire, remove and replace underground concrete duct banks as per plans submitted.”
- Alteration, filed Nov 27, 2024, estimated cost $3.1M, described as “Dep hunts point wrrf, NYC wastewater resiliency program assignmnet rlcy-hp-02-J18G-f-05. Remove & replace exist conduit & wire, remove and replace underground concrete duct banks as per plans submitted.”
- Alteration, filed Nov 27, 2024, estimated cost $4.0M, described as “Dep hunts point wrrf, main building, NYC wastewater resiliency program assignmnet rlcy-hp-02-J18G-f-06. Remove & replace exist conduit & wire, remove and replace underground concrete duct banks as per plans submitted.”
- Alteration, filed Nov 27, 2024, estimated cost $2.9M, described as “Dep hunts point wrrf, main building, NYC wastewater resiliency program assignmnet rlcy-hp-02-J21G-f-02. Remove & replace exist conduit & wire as per plans submitted.”
- Alteration, filed Nov 27, 2024, estimated cost $1.3M, described as “Dep hunts point wrrf, main building, NYC wastewater resiliency program assignmnet rlcy-hp-02-J21G-f-03. Remove & replace exist conduit & wire, remove & replace exist udg concrete duct banks as per plans submitted.”
- Alteration, filed Nov 27, 2024, estimated cost $1.6M, described as “Dep hunts point wrrf, main building, NYC wastewater resiliency program assignmnet rlcy-hp-02-J21G-f-04. Remove & replace exist conduit & wire, remove & replace exist udg concrete duct banks as per plans submitted.”
- Alteration, filed Aug 19, 2021, estimated cost $424K, described as “Provide ventilation air and heating for pump room and heating, cooling and ventilation for electrical room for the Feedwell and Digester Feed Pump Station.”
- Alteration, filed Aug 9, 2021, estimated cost $4.0M, described as “Design concrete foundation w/ grade beams, piles w/ concrete frame superstructure including columns, slabs, beams w/ interior pump supports, worker platform w/ steel framing, grating, CMU infill walls. Exterior C.I.P concrete stairs.…”
- Alteration, filed Aug 6, 2021, estimated cost $15.4M, described as “Existing digester demolition on the existing treatment plant site”
- Alteration, filed Aug 3, 2021, estimated cost $48.0M, described as “Excavation, site grading, construction of access roads, sidewalks, curbs. Installation of utilities, storm, sanitary,water, gas, electrical and pipe yard.”
- Alteration, filed Mar 26, 2021, estimated cost $3K, described as “Replace boiler pilot gas line.”
- Alteration, filed May 11, 2020, estimated cost $494K, described as “Hunts Point WWTP - Alkalinity Building. Primary scope of work is to Reinforce exterior walls and install new concrete walls. Construct new chemical fill pad.”
- Alteration, filed May 11, 2020, estimated cost $1.3M, described as “Hunts Point WWTP - Chlorination Building. Primary scope of work is to install new concrete columns along the west wall, and to reinforce other exterior walls (N, S, E).”
- Alteration, filed May 5, 2020, estimated cost $70K, described as “Hunts Point WWTP - Alkalinity Building. Primary scope of work is to install new (elevated) louvers, and re-route gutter.”
- Alteration, filed May 5, 2020, estimated cost $2K, described as “Hunts Point WWTP - Aeration Gallery. Scope of work includes disconnect and re-installation of existing HVAC fan to new raised roof curb.”
- Alteration, filed Apr 30, 2020, estimated cost $685K, described as “Hunts Point WWTP - Dewatering Effluent Pump Station. Primary scope of structural work is to install rock anchors and concrete buttress in basement, and reinforce exterior walls.”
- Alteration, filed Apr 30, 2020, estimated cost $685K, described as “Hunts Point WWTP - Dewatering Building. Primary scope of structural work is to reinforce exterior walls.”
- Alteration, filed Apr 29, 2020, estimated cost $636K, described as “Hunts Point WWTP - Aeration Building North. Scope of work is to reinforce exterior walls”
- Alteration, filed Apr 27, 2020, estimated cost $16K, described as “Hunts Point WWTP - Primary Sludge Pump Station East. Install new 3" drain from flood protection assembly to existing basement sump pit.”
- Alteration, filed Mar 20, 2020, estimated cost $17K, described as “Hunts Point WWTP Alkalinity Building, scope of work is to route new floor drain to existing sump pit, adjust gutter routing, extend and adjust piping, and add a check valve on a condensate drain.”
- Alteration, filed Mar 20, 2020, estimated cost $105K, described as “Hunts Point WWTP Aeration Gallery, primary scope of work is to install three (3) new drain pipes from the hatch drains to the existing sump pumps, and to replace an existing sump pump.”
- Alteration, filed Mar 20, 2020, estimated cost $64K, described as “Hunts Point WWTP Dewatering Effluent Pump Station, primary scope of work is to replace existing sump pump and valves with new sump pump and valves and installation of new area floor drain and piping from the flood protection assembly to…”
- Alteration, filed Mar 20, 2020, estimated cost $36K, described as “Hunts Point WWTP Dewatering Building, primary scope of work is to raise two (2) fresh air inlets and extend two (2) sprinkler standpipes approximately 1 ft through new wall.”
- Alteration, filed Mar 20, 2020, estimated cost $39K, described as “Hunts Point WWTP Chlorination Building, scope of work is to replace and install three (3) check valves and adjust heating piping and a hose bib due to new strengthened wall.”

11 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/2027800002/1260-ryawa-avenue.

## Building history

- New Building, filed Nov 10, 2020, plan exam - disapproved, 1 story, described as “Three small prefabricated structures (6'-3" wide x 10'-0" long x 10'-0" high) located below the overhead digester gas piping to house drip traps for condensate removal. These are unoccupied spaces with exhaust fan and motor actuated supply…”
- New Building, filed Nov 10, 2020, plan exam - disapproved, 1 story, described as “General drawings for three small prefabricated structures (6'-3' wide x 10'-0' long x 10'-0' high) located below the overhead digester gas piping to house drip traps for condensate removal.”
- New Building, filed Nov 10, 2020, plan exam - disapproved, 1 story, described as “Construction of three single-story, pre-cast concrete condensate control rooms.”
- New Building, filed Nov 4, 2020, plan exam - disapproved, 1 story, described as “Pumping of thickened primary and waste activated sludge from existing gravity thickeners to two digester feedwells and thickened sludge pumping from feedwells to four new anaerobic digesters. Pump station houses six progressing cavity…”
- New Building, filed Nov 4, 2020, plan exam - disapproved, 1 story, described as “General drawings for digester feed pump station - pumping of thickened primary and waste activated sludge from existing gravity thickeners to two digester feedwells and thickened sludge pumping from feedwells to four new anaerobic…”
- New Building, filed Nov 4, 2020, permit issued - entire job/work, 1 story
- New Building, filed Nov 4, 2020, plan exam - disapproved, 1 story, described as “Civil work including excavation, site grading, construction of access road, sidewalks, installation of utilities, storm, water, gas, electrical and pipe yard for the feedwell and digester feed pump station.”
- New Building, filed Nov 4, 2020, plan exam - disapproved, 1 story, described as “Geotechnical investigations for the digester feed pump station”
- New Building, filed Nov 3, 2020, application processed - entire, 1 story, described as “Pumping of thickened primary and waste activated sludge from existing gravity thickeners to two digester feedwells and thickened sludge pumping from feedwells to four new anaerobic digesters. Pump station houses six progressing cavity…”
- New Building, filed Sep 23, 2020, application processed - entire, 1 story, described as “General drawings for three small prefabricated structures (6'-3' wide x 10'-0' long x 10'-0' high) located below the overhead digester gas piping to house drip traps for condensate removal.”

The 10 most recent of 21 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Zoning

M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 15 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 14 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
