# 1861 Anthony Avenue, The Bronx

Public School · built c. 1907 · Block 2804, Lot 31.

On Umarelli: https://umarelli.org/nyc/2028040031/1861-anthony-avenue

More construction in Mount Hope and Mount Eden: https://umarelli.org/nyc/bronx/mount-hope-and-mount-eden.md

Every lot on block 2804: https://umarelli.org/nyc/bronx/2804.md

## Building permits

- Alteration, filed Jun 15, 2023, estimated cost $20K, described as “Installation of debris chute for ps 28X at 1861 anthony avenue, bronx as per indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Feb 3, 2023, estimated cost $20K, described as “Soe/PS28X - (shoring of excavation) submitting on behalf of contractor, in conjunction with DOB # 201202554 no change in use, occupancy or egress”
- Alteration, filed Feb 1, 2023, estimated cost $20K, described as “Sou/PS28X - (underpinning) submitting on behalf of contractor, in conjunction with DOB # 201202554 no change in use, occupancy or egress”
- Alteration, filed Jan 25, 2023, estimated cost $20K, described as “Installation of temporary construction fence for ps 28X at 1861 anthony avenue, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 20, 2023, estimated cost $20K, described as “Installation of new sidewalk shed for ps 28X at 1861 anthony avenue, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 20, 2023, estimated cost $20K, described as “Installation of pipe scaffold for ps 28X at 1861 anthony avenue, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Mar 29, 2022, estimated cost $16.5M, described as “The schedule of work on contract drawings, demolition and proposed, including: a. Exterior masonry, b. Exterior limestone, c. Windowse, d. Exterior window surrounds, e. Exterior doors, f. Chimney, g. Parapets, h. Roof bulkhead, i. Interior…”
- Alteration, filed Dec 22, 2021, estimated cost $60K, described as “Submitted on behalf of contractor for the installation of temporary emergency construction equipment (scaffold= 15000 sf), in conjunction with llw# 127937. No change in use, occupancy or egress.”
- Alteration, filed Sep 13, 2021, estimated cost $112K, described as “Submitted on behalf of contractor for the installation of temporary emergency construction equipment (shed = 800 lf), in conjunction with llw# 127937. No change in use, occupancy or egress.”

## Property taxes

- Assessment: $3,011,400
- Market value (city estimate): $6,692,000
- Taxable value: $0
- Assessed land: $381,150
- Assessed improvements: $2,630,250

## Zoning

R8: floor area ratio 2.36 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
