1426 Townsend Avenue, The Bronx
Public school · built c. 1922 · Block 2843, Lot 40.
Building permits
- Alteration, filed Aug 10, 2026, estimated cost $30K, described as “Filing for temporary sidewalk shed. No change in use, egress or occupancy. Filing in conjuction with X01023681”
- Alteration, filed Jul 28, 2026, estimated cost $20K, described as “Filing for temporary construction fence No change in use, egress or occupancy. Filing in conjuction with X01023681”
- Alteration, filed Feb 26, 2026, estimated cost $65K, described as “Rm 458 remove and install bathroom partitions, accessories and finishes. Rm 112B: install new door frame to female locker room; reinstall existing door; signage.”
- Alteration, filed Jan 6, 2026, estimated cost $195K, described as “The scope of work includes all labor, materials, and equipment necessary to complete installation of the supplemental cooling system in the auditorium.”
- Alteration, filed Jan 6, 2026, estimated cost $150K, described as “The scope of work includes all labor, materials, and equipment necessary to complete installation of the supplemental cooling system in the cafeteria.”
- Alteration, filed Aug 15, 2025, estimated cost $459K, described as “Removal and replace partitions, wall base, doors and door hardware, finishes, built in shelving, ceiling & soffit, radiator enclosure, window shade, fixtures and finishes.”
- Alteration, filed Mar 21, 2024, estimated cost $2.7M, described as “Removal of two TCUs. Playground Redevelopment includes the following: removal of artificial turf field, new basketball court; installation of new playground equipment and safety surface. Installation of planters and outdoor seating.”
- Alteration, filed Jun 21, 2023, estimated cost $5K, described as “Filing for chute installation on behalf of contractor”
- Alteration, filed Mar 15, 2022, estimated cost $70K, described as “Filing for SOE on behalf of contractor”
- Alteration, filed Mar 11, 2022, estimated cost $10K, described as “Filing for the installation of construction fence on behalf of contractor”
- Alteration, filed Mar 10, 2022, estimated cost $40K, described as “Filing for shed installation on behalf of contractor”
- Alteration, filed Mar 10, 2022, estimated cost $60K, described as “Filing for the installation of pipe scaffolding on behalf of contractor”
- Alteration, filed Jan 20, 2021, estimated cost $2K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (scaffold) 200 sf, in conjunction with X00368073 no change in use, occupancy or egress”
- Alteration, filed Jul 21, 2020, estimated cost $10K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (shed) 64 lf, no change in use, occupancy or egress”
Property taxes
- Assessment
- $3,963,600
- Market value (city estimate)
- $8,808,000
- Taxable value
- $0
- Assessed land
- $338,850
- Assessed improvements
- $3,624,750
Zoning
R8: floor area ratio 1.69 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.