# 21 East Clarke Place, The Bronx

Industrial · built c. 1920 · Block 2856, Lot 1.

On Umarelli: https://umarelli.org/nyc/2028560001/1320-inwood-avenue

More construction in Highbridge and Morris Heights: https://umarelli.org/nyc/bronx/highbridge-and-morris-heights.md

## Building permits

- New Building — Mid-Rise, filed Aug 11, 2023, 210 units, 14 stories, described as “Construct new 14 story mixed use building as per plans filed.”
- Alteration, filed Sep 2, 2026, estimated cost $17K, described as “Construction of temporary "construction shanty" as per drawings. No change in use, egress and occupancy.”
- Alteration, filed Aug 25, 2026, estimated cost $1K, described as “Filing to protect neighbor during construction of new building. This system is a site specific engineered enclosure system subject to the requirements of bc 3309.17. No change in use, egress, or occupancy”
- Alteration, filed Jun 12, 2026, estimated cost $5K, described as “Use of Knuckleboom for building construction. This application is filed in conjunction with NB X00908433”
- Alteration, filed Mar 2, 2026, estimated cost $5K, described as “Use of placing boom for building construction. This application is filed in conjunction with NB X00908433”
- Alteration, filed Mar 2, 2026, estimated cost $5K, described as “Use of material platform for building construction. This application is filed in conjunction with NB X00908433”
- Alteration, filed Feb 18, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Feb 9, 2026, estimated cost $1K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Feb 4, 2026, estimated cost $24K, described as “Installation of 7000 lb dual personnel hoist car as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress, or occupancy under this application.”
- Alteration, filed Dec 5, 2025, estimated cost $10K, described as “Installation of temporary construction fence as per approved drawings.”
- Alteration, filed Aug 15, 2025, estimated cost $20K, described as “Sub-Slab Depressurization System filing for NB”
- Alteration, filed Aug 7, 2025, estimated cost $10K, described as “Shoring system for retaining wall”
- Alteration, filed Mar 17, 2025, estimated cost $20K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 27, 2025, estimated cost $22K, described as “Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # X01157717. No change to use, egress or occupancy under this application.”
- Alteration, filed Feb 19, 2025, estimated cost $160, described as “Proposed construction fence, no change to use, egress or occupancy under this application.”
- Demolition, filed Jan 7, 2025, estimated cost $125K, described as “Full demolition to a one story building”

## Property taxes

- Assessment: $725,850
- 2026–27 tax: $64,652
- Market value (city estimate): $1,613,000
- Taxable value: $595,980
- Assessed land: $193,950
- Assessed improvements: $531,900

## Zoning

R8A: floor area ratio 1.00 built, 6.02 allowed by base zoning.

## Recent sales

- Jan 25, 2023: $12,725,500

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Permits Filed for 1320 Inwood Avenue in Mount Eden, The Bronx](https://newyorkyimby.com/2023/08/permits-filed-for-1320-inwood-avenue-in-mount-eden-the-bronx.html), New York YIMBY, Aug 14, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology