## Building permits

- Alteration, filed Mar 27, 2026, estimated cost $294K, described as “Installation of roof mounted pv solar energy system. No change of use, egress, or occupancy.”
- Alteration, filed Feb 2, 2026, estimated cost $10K, described as “Installation of pipe scaffolding and needle beams as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 28, 2025, estimated cost $2.5M, described as “Filing herewith for general construction as per the plans submitted herewith. No change to occupancy, use, or egress.”
- Alteration, filed Jul 22, 2025, estimated cost $4K, described as “Installation of temporary barricade as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2025, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 11, 2025, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2024, estimated cost $4K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 24, 2024
- Alteration, filed Oct 8, 2024
- Alteration, filed Sep 26, 2024, estimated cost $10K, described as “Installation of pipe scaffolding and needle beams as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 24, 2024, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 25, 2024, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 20, 2024, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 7, 2023, estimated cost $1K, described as “Installation of two boilers in conjunction with NB. Mechanical work filed separately under X00546218-I1”
- Alteration, filed Jan 4, 2023, estimated cost $2K, described as “Install new sprinkler standpipe system in conjunction with NB# 210180819. Application filed under 2014 Code.”
- Alteration, filed Jan 4, 2023, estimated cost $1K, described as “SOE in conjunction with NB 210180819”
- Alteration, filed Jan 4, 2023, estimated cost $1K, described as “Temporary standpipe in conjunction with NB as required by BC 3303.8”
- Alteration, filed Aug 29, 2022, estimated cost $1K, described as “Structural work in conjunction with NB#210180819”
- Alteration, filed Aug 25, 2022, estimated cost $1K, described as “Mechanical work in conjunction with NB#210180819”
- Alteration, filed Aug 25, 2022, estimated cost $1K, described as “Plumbing work in conjunction with NB# 210180819”
- Alteration, filed Aug 25, 2022, estimated cost $1K, described as “Foundation work in conjunction with NB# 210180819”
- Alteration, filed Aug 16, 2021, estimated cost $50K, described as “Installation of scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 16, 2021, estimated cost $103K, described as “Installation of heavy duty sidewalk shed during bldg demolition, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”

1 more, older permit is in this building’s full list on the map: https://umarelli.org/nyc/2028650134/1600-macombs-road.

## Property taxes

- Assessment: $121,380
- Market value (city estimate): $2,023,000
- Taxable value: $0
- Assessed land: $121,380

## Tax breaks

- 420-c exemption, through Jun 30, 2059, about $24,085 a year below the full tax.

## Zoning

R8A: floor area ratio 0.00 built, 6.02 allowed by base zoning.

## Recent sales

- Jun 27, 2024: $14,126,316

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.