# 334 East 176th Street, The Bronx

Apartment building · 154 units · built 2022 · Block 2892, Lot 34.

On Umarelli: https://umarelli.org/nyc/2028920034/334-east-176-street

More construction in Mount Hope and Mount Eden: https://umarelli.org/nyc/bronx/mount-hope-and-mount-eden.md

## Building permits

- Alteration, filed Jul 11, 2024, described as “Installation and use of suspended scaffold.”
- Alteration, filed Mar 11, 2024, estimated cost $44K, described as “Herewith filing application to install scaffolding as per plans.”
- Alteration, filed Jan 24, 2024, estimated cost $1K, described as “Installation of single personnel/material hoist in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jan 8, 2024, estimated cost $28K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Apr 5, 2022, estimated cost $70K, described as “Installation of temporary construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Dot permits by others for fence on sidewalk/roadway.”
- Alteration, filed Mar 17, 2022, estimated cost $1K, described as “Filing herewith temporary standpipe and pressurization alarm as per plans. All work done in conjunction with new building 210182041.”
- Alteration, filed Sep 15, 2021, estimated cost $1K, described as “Filing herewith plumbing work for installation of stormwater detention tank with associated piping, inlets and a combined sewer connection & separate sanitary connection for a proposed 8-story apartment building.”
- Alteration, filed Aug 24, 2021, estimated cost $1K, described as “Filing herewith foundation work in conjunction with new building as per plans.”
- Alteration, filed Aug 13, 2021, estimated cost $1K, described as “Filing herewith retaining wall as per plans.”
- Alteration, filed Jul 27, 2021, estimated cost $1K, described as “Filing herewith support of excavation in conjunction with a new building as per plans.”
- Alteration, filed Jul 21, 2021, estimated cost $1K, described as “Filing herewith structural work in conjunction with new building 210182041 as per plans.”
- Alteration, filed Jun 11, 2021, estimated cost $1K, described as “Filing herewith installation of sprinkler and standpipe system in conjunction with new building as per plans.”
- Alteration, filed Apr 8, 2021, estimated cost $1K, described as “Filing herewith boiler in conjunction with new building as per plans.”
- Alteration, filed Mar 15, 2021, estimated cost $1K, described as “Filing herewith mechanical work in conjunction with new building application #210182041..”
- Alteration, filed Mar 3, 2021, estimated cost $1K, described as “Filing herewith plumbing work in conjinction with new building application number 210182041.”

## Property taxes

- Assessment: $10,402,650
- Market value (city estimate): $23,117,000
- Taxable value: $0
- Assessed land: $634,500
- Assessed improvements: $9,768,150

## Tax breaks

- 420-c exemption, through Jun 30, 2062, about $1,293,986 a year below the full tax.

## Zoning

R7-1: floor area ratio 5.83 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 27, 2019: $6,000,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Construction Breaks Ground on Baez Place Affordable Apartments at 334 East 176th Street in Claremont, The Bronx](https://newyorkyimby.com/2022/08/construction-breaks-ground-on-baez-place-affordable-apartments-at-334-east-176th-street-in-claremont-the-bronx.html), New York YIMBY, Aug 17, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
