# 4179 3rd Avenue, The Bronx

Condominium · 189 units · built 2018 · Block 2924, Lot 7501.

On Umarelli: https://umarelli.org/nyc/2029247501/4179-3-avenue

More construction in Bathgate: https://umarelli.org/nyc/bronx/bathgate.md

Every lot on block 2924: https://umarelli.org/nyc/bronx/2924.md

## Building permits

- Alteration, filed Jun 10, 2024, described as “Non-illuminated non-advertising double-sided projecting accessory sign - community healthcare network. No change of use, egress or occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $255K, described as “Filing general construction for tenant fit out in existing community center space as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $43K, described as “Filing plumbing application for tenant fit out in existing commercial space as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $21K, described as “Filing sprinkler application for tenant fit out in existing commercial space as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Aug 23, 2022, estimated cost $145K, described as “Filing mechanical application for tenant fit out in existing commercial space as per plan filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Jan 13, 2022, estimated cost $286K, described as “Filing herewith for installation of new sprinkler heads in conjunction with first floor school fitout.”
- Alteration, filed Jan 12, 2022, estimated cost $2.5M, described as “Mechanical Fit Out of first floor space.”
- Alteration, filed Oct 7, 2021, estimated cost $2.2M, described as “Interior fit out of school on first floor. Install new non-load bearing partitions, fixtures, and finishes.”
- Alteration, filed Jun 6, 2018, estimated cost $10K, described as “Installation of heavy duty sidewalk shed & pipe scaffold & needle beams as per plans. Sidewalk shed live load 300 psf . Some sidewalk shed posts will be installed in the roadway as per plans. All equipment shall comply with chapter #33 of…”
- Alteration, filed Mar 30, 2018, estimated cost $5K, described as “Installation of temporary construction fence as per plans.”

## Property taxes

- Assessment: $18,416,250
- 2026–27 Tax: $42,736
- Market value (city estimate): $40,925,000
- Taxable value: $1,575,610
- Assessed land: $747,000
- Assessed improvements: $17,669,250
- Condo units with their own tax lots: 5

## Tax breaks

- 420-c exemption, through Jun 30, 2061, about $2,066,523 a year below the full tax.

## Zoning

M1-4/R7X (part of the lot is M1-4/R7A): floor area ratio 4.81 built, 5.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
