# 1330 Intervale Avenue, The Bronx

Apartment building · 128 units · built 2006 · Block 2976, Lot 7.

On Umarelli: https://umarelli.org/nyc/2029760007/1330-intervale-avenue

More construction in Morrisania and Longwood: https://umarelli.org/nyc/bronx/morrisania-and-longwood.md

Every lot on block 2976: https://umarelli.org/nyc/bronx/2976.md

## Building permits

- Alteration, filed Apr 9, 2026, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Nov 25, 2025, estimated cost $50K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 22, 2025, estimated cost $550K, described as “Proposed exterior facade repairs and waterproofing, removal of existing roof system. Install new insulation, new roof and sustainable roof under this application. No change in use, egress or occupancy.”
- Alteration, filed Jul 18, 2025, estimated cost $1.6M, described as “It is proposed to renovate interior of building as shown on plan. No change of use, egress or occupancy. Application filed in conjunction with subsequent applications X01241274-S1 (ms), X01241274-S2 (pl) and X01241274-S3 (be)”
- Alteration, filed Dec 7, 2023, described as “CD5 renewal”
- Alteration, filed Jan 3, 2023, estimated cost $30K, described as “Installation of accessory door and associated storefront wall. No change to use, egress, or occupancy.”
- Alteration, filed Aug 4, 2022, estimated cost $440K, described as “Facade work including removing, replacing, and repairing of walls, bricks and mortar. No change to use, occupancy or egress under this application.”
- Alteration, filed Feb 25, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 19, 2018, estimated cost $8K, described as “Installation of heavy duty sidewalk shed & pipe scaffold as per plans. Sidewalk shed live load 300 psf . All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”

## Property taxes

- Assessment: $3,235,050
- 2026–27 tax: $11,065
- Market value (city estimate): $7,189,000
- Taxable value: $88,952
- Assessed land: $866,700
- Assessed improvements: $2,368,350

## Tax breaks

- 421-a exemption, through Jun 30, 2035, about $391,343 a year below the full tax.

## Zoning

R7-1: floor area ratio 5.86 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- LOUIS NINE BLVD/INTERVALE AVE (City Planning P2005X0335): Completed, decided Oct 3, 2005. UDAAP & DISPO TO CONSTRUCT A BLDG WITH APPROX 174 RENTAL\*UNITS FOR LOW-INCOME, HOMELESS & FOSTER CARE FAMILIES

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
