4263 3rd Avenue, The Bronx
Public school · built 2025 · Block 3044, Lot 88.
Building permits
- New Building — Non-residential, filed May 22, 2024, 6 stories, described as “The project, 4263 3RD avenue, is located at the intersection of third avenue and east 178THSTREET in the bronx, ny. The site is located in a M1-4/R7A, mx-14 zoning district and isapproximately 14,000 sf in area, combination of lots #88…”
- Alteration, filed Jun 16, 2026, estimated cost $2K, described as “Non-illuminated non-advertising accessory sign for bronx tremont park school - in property lines - zeta. No change of use, egress or occupancy.”
- Alteration, filed Jun 16, 2026, estimated cost $3K, described as “Non-illuminated non-advertising accessory sign for bronx tremont park school - in property lines - z. No change of use, egress or occupancy.”
- Alteration, filed Jun 4, 2026, estimated cost $30K, described as “Temp Spinkler loop for Annex portion of building”
- No Work, filed May 29, 2026
- No Work, filed May 29, 2026
- Alteration, filed May 5, 2026, estimated cost $15K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 4, 2024, estimated cost $15K, described as “Temporary standpipe”
- Alteration, filed Sep 26, 2024, estimated cost $7K, described as “Construction fence as per drawings during NB const, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Dot permits by others for fence installed on…”
- Alteration, filed Sep 19, 2024, estimated cost $50K, described as “Provide bracing on the remnant wall along the rear of the property.”
- Alteration, filed Aug 30, 2024, estimated cost $50K, described as “Plywood construction fence to protect site during construction”
- Alteration, filed Jun 27, 2024, estimated cost $13K, described as “Installation of sidewalk shed at rear of building for demolition of building as per plans. No change in use, egress or occupancy under this application. Sidewalk shed shall comply with chapter 33 of the 2022 building code.”
- Demolition, filed Mar 28, 2024, estimated cost $300K, described as “Full demolition of one story structure using hand held and mechanical means to assist on grade, from exterior.”
Property taxes
- Assessment
- $321,300
- Market value (city estimate)
- $714,000
- Taxable value
- $0
- Assessed land
- $321,300
Tax breaks
- Nonprofit exemption (nonprofit, use planned), with no end date, about $34,855 a year below the full tax.
Zoning
M1-4/R7A: floor area ratio 4.88 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 29, 2024: $7,245,900, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.