4422 3rd Avenue, The Bronx
Hospital · built 1943 · Block 3064, Lot 1.
Building permits
- Alteration, filed Nov 17, 2026, estimated cost $45.0M, described as “New two story horizontal enlargement to existing Hospital building. Filing for Phased approval in compliance with AC 28-104.2.5. Hub Consultation meeting conducted 9-11-2026.”
- Alteration, filed Nov 9, 2026, estimated cost $400K, described as “Proposed early site work demolition as per plans.”
- Alteration, filed Nov 5, 2026, estimated cost $250K, described as “Sbh behaviorial health - 4422 third avenue - general construction early demo package including modifications to existing ceilings, floors, partitions and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 26, 2026, estimated cost $15.3M, described as “Sbh behaviorial health - 4422 third avenue - general construction including modifications to existing ceilings, floors, partitions and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 1, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Mar 26, 2026, estimated cost $670K, described as “Sbh detox suite - 4422 third avenue - general construction including modifications to existing ceilings, floors, partitions and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 17, 2024, estimated cost $60K, described as “Herewith filing for mechanical modifications on the 6th floor and roof including reno to existing isolation room with new exhaust fan, new ductwork and new bag in bag out filter. No change in use, egress, or occupancy.”
- Alteration, filed Aug 22, 2022, estimated cost $100K, described as “Facade and minor parapet Repair as noted on plans on east west south and north elevations. no change in use, egress or occupancy.”
- Alteration, filed May 18, 2022, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed May 18, 2022, estimated cost $9K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jan 26, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed May 26, 2021, estimated cost $42K, described as “Filing of New Plumbing Fixtures with Piping & Addition/Modification to existing Sprinkler Systems for First Floor Renovation in Conjunction with Alt2 Job #X00492991”
- Alteration, filed May 25, 2021, estimated cost $42K, described as “Installation of New Mechanical Equipment for first floor Renovation”
- Alteration, filed May 13, 2021, estimated cost $10K, described as “Structural wrok on first floor - create new opening in physica therapy room , new columns and shoring post”
- Alteration, filed Apr 26, 2021, estimated cost $410K, described as “Renovation of existing partial first floor and enlargement of existing physical therapy area”
- Alteration, filed Feb 16, 2021, estimated cost $40K, described as “Direct replacement of an Air Handler Unit at Sub Basement. No change in use, egress or occupancy”
- Alteration, filed Jan 6, 2021, estimated cost $20K, described as “Installation of an Air Exhaust System and ductwork on the 6th, 7th, and 8th floor roof. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2020, estimated cost $1K, described as “Installation of temporary 65' high pipe scaffold originating (off shed) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Aug 12, 2020, estimated cost $15K, described as “Replace Exhaust Fan at roof and new duct work at 4th Floor Center for Comprehensive Care and Detox Unit. No change in use, egress or occupancy.”
- Alteration, filed Apr 27, 2020, estimated cost $100K, described as “Minor plumbing and sprinkler modification on 4th floor MRI/CT scan room in conjunction with application #220686014. no change in egress, use, or occupancy.”
- Alteration, filed Apr 16, 2020, estimated cost $48K, described as “Installation of 6 split system units at 4th floor MRI/CT scan room in conjunction with application #220686014. no change in egress, use, or occupancy.”
- Alteration, filed Feb 19, 2020, estimated cost $100K, described as “Minor renovation consisting of raised floor and reinforcement for new MRI/CT equipment”
- Alteration, filed Jan 30, 2020, estimated cost $1K, described as “Installation of support scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Nov 5, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $25,930,800
- Market value (city estimate)
- $57,624,000
- Taxable value
- $0
- Assessed land
- $1,786,500
- Assessed improvements
- $24,144,300
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $2,812,973 a year below the full tax.
Zoning
R7-1: floor area ratio 2.56 built, 3.44 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- St. Barnabas Nursing Home (City Planning P2016X0013): Completed, decided Feb 23, 2016. This is a private application by St. Barnabas Nursing Home, Inc. requesting a Commission Certification pursuant to 22-42 that none of the conditions would require a special permit pursuant to 74-90 for operation of the St. Barnabas Nursing…
- ST BARNABAS HOSPITAL BRIDGE (City Planning P1998X0422): Completed. 98DCP057X: TO CONSTRUCT A PEDESTRIAN BRIDGE OVER THIRD AVENUE THAT WILL CONNECT THE MAIN CAMPUS OF THE HOSPITAL WITH THE NEW AMBULA TORY CARE BUILDING
- QUARRY ROAD URA, 1ST AMENDMENT (City Planning P1997X0491): Completed. 95HPD003X: CONSTRUCTION OF A 355-SPACE ACCESSORY PARKING GARAGE TO SERV E A NEARBY HOSPITAL FACILITY
- ST BARNABAS HOSPITAL BRIDGE (City Planning P1998X0339): Completed, decided Jul 13, 1999. 99DOT002X: TO CONTRUCT A PEDESTRIAN BRIDGE TO CROSS THIRD AVENUE CONNEC TING THE PROPOSED NEW AMBULATORY CARE BUILDING TO THE MAIN C AMPUS