# 2075 Webster Avenue, The Bronx

Public school · built 2023 · Block 3142, Lot 48.

On Umarelli: https://umarelli.org/nyc/2031420048/2075-webster-avenue

More construction in Fordham: https://umarelli.org/nyc/bronx/fordham.md

Every lot on block 3142: https://umarelli.org/nyc/bronx/3142.md

## Building permits

- Alteration, filed Sep 19, 2025, estimated cost $40K, described as “Soe for new playground at ps 163X.”
- Alteration, filed May 21, 2025, estimated cost $1K, described as “Convert existing wet standpipe to dry standpipe to serve as temporary protection during demolition.”
- Alteration, filed Mar 10, 2025, estimated cost $1K, described as “Convert existing wet standpipe to dry standpipe to serve as temporary protection during demolition.”
- Alteration, filed Nov 26, 2024, estimated cost $50K, described as “Installation of supported scaffold for access to work locations.”
- Demolition, filed Sep 17, 2024, estimated cost $700K, described as “Full demolition of three story structure using hand held and mechanical means to assist”
- Alteration, filed Sep 17, 2024, estimated cost $250K, described as “Selective Interior demo of non-Load bearing and non-structural; ceiling, drywalls, doors and finished flooring, per plans”
- Alteration, filed Dec 7, 2023, described as “Facade Repair | Exterior Facade Caulking | Exterior Waterproofing”
- Alteration, filed Jun 15, 2023, estimated cost $10K, described as “Installation of temporary standpipe”
- Alteration, filed Mar 16, 2023, estimated cost $10K, described as “Installation of temporary standpipe”
- Alteration, filed Jan 26, 2023, estimated cost $50K, described as “SOE for Site Utilities in conjunction with 4 story new building (163X). All as per plans filed herewith.”
- Alteration, filed Oct 10, 2022, estimated cost $50K, described as “Installation of temporary supported scaffold in elevator shaft as per plans filed herewith.”
- Alteration, filed Jul 20, 2022, estimated cost $1.3M, described as “PS 496X - Herewith filing landscape application.”
- Alteration, filed Jul 18, 2022, estimated cost $50K, described as “Installation of construction fence work for demolition and rock removal phase in conjunction with job# 201204446, related application for fn is soe: soe-X00764837”
- Alteration, filed Jul 18, 2022, estimated cost $100K, described as “Installation of sidewalk shed for protection of public from areas of exposure during construction work for site demolition and rock removal phase in conjunction with job# X00776249-I1”
- Alteration, filed Jun 30, 2022, estimated cost $200K, described as “Proposed support of excavation in conjunction with 4 story new school building (ps 163X).”
- Alteration, filed Oct 7, 2021, estimated cost $2K, described as “190265 PS 496X - Herewith filing sprinkler, standpipe, and booster pump work type for 4-story new school building”
- Alteration, filed Oct 7, 2021, estimated cost $1K, described as “Ps 496X - herewith filing fuel storage/generator work type in conjunction with NB 201204446”
- Alteration, filed Oct 7, 2021, estimated cost $1K, described as “Ps 496X - herewith filing fs/generator work type in conjunction with new building 201204446”
- No Work, filed Oct 6, 2021
- No Work, filed Oct 6, 2021
- Alteration, filed May 25, 2021, estimated cost $6K, described as “Filing for installation of temporary construction fence on behalf of contractor”

## Property taxes

- Assessment: $3,989,700
- Market value (city estimate): $8,866,000
- Taxable value: $0
- Assessed land: $287,100
- Assessed improvements: $3,702,600

## Zoning

R7-1: floor area ratio 1.02 built, 3.44 allowed by base zoning.