# 2488 Grand Concourse, The Bronx

Commercial · built c. 1937 · Block 3153, Lot 9.

On Umarelli: https://umarelli.org/nyc/2031530009/2488-grand-concourse

More construction in Fordham: https://umarelli.org/nyc/bronx/fordham.md

Every lot on block 3153: https://umarelli.org/nyc/bronx/3153.md

## Building permits

- Alteration, filed Oct 29, 2026, estimated cost $44K, described as “Plumbing alteration in relation to changes in interior office layouts”
- Alteration, filed Jun 22, 2026, estimated cost $80K, described as “Removal of non-load bearing partitions and finishes. No change in use, egress or occupancy.”
- Alteration, filed Mar 4, 2026, estimated cost $23K, described as “Interior renovation of the existing general store to replace the hood system and the ductwork system, etc. No change of use, egress or occupancy”
- Alteration, filed Aug 20, 2024, estimated cost $69K, described as “Elite eye care tenant fit out per plans filed herewith.”
- Alteration, filed Jun 27, 2024, estimated cost $1K, described as “Erect illuminated d/f accessory business projecting sign with flag logo graphic”
- Alteration, filed Jun 27, 2024, estimated cost $9K, described as “Erect illuminated accessory business wall sign; copy reading "bank of america with flag logo"”
- Alteration, filed Apr 5, 2024, estimated cost $109K, described as “Base building mechanical systems: replace existing air conditioning units with new split system heat pumps serving (4) tenant spaces and provide toilet exhaust.”
- Alteration, filed Mar 1, 2024, estimated cost $5K, described as “Removal of existing steel framed outdoor sign structure on roof per violation 35649100L. No change in use, egress or occupancy.”
- Alteration, filed Jun 30, 2023, estimated cost $124K, described as “Replacement of four exiting mechanical equipment units located at the 3rd fl low roof. No change to use, egress or occupancy.”
- Alteration, filed Oct 23, 2022, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 27, 2022, estimated cost $450K, described as “Facade and parapet repair”
- Alteration, filed Jan 5, 2022, estimated cost $30K, described as “Installation of scaffolding from grand concourse and east fordham road side. No change in use, egress and occupancy.”
- Alteration, filed Nov 10, 2021, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 13, 2020, estimated cost $1K, described as “Install exterior illuminated wall sign (metro by t-mobile)”
- Alteration, filed Mar 12, 2019, estimated cost $2K, described as “Install illuminated wall sign (bon bini)”
- Alteration, filed Jul 11, 2018, estimated cost $1K, described as “Installation of temporary construction fence.”

## Property taxes

- Assessment: $15,144,300
- 2026–27 Tax: $938,790
- Market value (city estimate): $33,654,000
- Taxable value: $8,654,040
- Assessed land: $1,350,000
- Assessed improvements: $13,794,300

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2032, about $704,063 a year below the full tax.

## Zoning

C4-4: floor area ratio 3.70 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 124-11-BZ): Variance or special permit, Granted, filed Aug 24, 2011, decided Dec 13, 2011. Special Permit (§73-36) to allow the operation of a physical culture establishment (Planet Fitness). C4-4 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
