100 W Mosholu Parkway S, The Bronx
Public school · built c. 1927 · Block 3251, Lot 201.
Building permits
- New Building — Non-residential, filed Apr 1, 2021, estimated cost $13.0M, 1 story, described as “Filing for new 1 story (plus cellar) building for bronx high school of science (sca) as shown per plan.”
- Alteration, filed Aug 17, 2022, estimated cost $10K, described as “Filing for installation of pipe scaffolding on behalf of contractor for emergency work”
- Alteration, filed Aug 17, 2022, estimated cost $3K, described as “Filing for installation of sidewalk shed on behalf of contractor for emergency work”
- Alteration, filed Aug 13, 2021, estimated cost $15K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 1, 2021, estimated cost $60K, described as “Installation of plywood fence as per drawings during NB const, filed sep. Plywood fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 20, 2021, estimated cost $1.3M, described as “Installation of HVAC units filed in conjunction with NB # . No change in use, egress or occupancy.”
- Alteration, filed May 7, 2021, estimated cost $372K, described as “Installation of plumbing and sprinkler work types filed in conjunction with NB # X00491133. No change in use, egress or occupancy.”
- Alteration, filed Apr 28, 2021, estimated cost $1K, described as “Civil site work for all non-plumbing related work including internal roadway, fire access road, pavement markings, roadside signage, and non plumbing utilities including but not limited to: electrical vaults, manholes, and conduits.”
- Alteration, filed Apr 28, 2021, estimated cost $275K, described as “Support of excavation for the NB # X00491133.”
- Alteration, filed Apr 14, 2021, estimated cost $14.0M, described as “New 2 story educational facility with reinforced concrete foundations and walls with shallow footings, slab on grade at cellar level and a structural steel superstructure with concrete on metal deck slabs at first floor and roof levels.”
- Alteration, filed Apr 24, 2020, estimated cost $20K, described as “Fn/HS445X - for temporary construction equipment(fence) submitting on behalf of contractor, no change in use, occupancy or egress”
Property taxes
- Assessment
- $68,022,450
- Market value (city estimate)
- $151,161,000
- Taxable value
- $0
- Assessed land
- $8,167,950
- Assessed improvements
- $59,854,500
Zoning
R6: floor area ratio 0.55 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.