## Building permits

- No Work, filed Sep 18, 2026, described as “Events in Edwards Parade Lawn at Fordham University, Rose Hill Campus.”
- Alteration, filed Jul 30, 2026, estimated cost $29K, described as “Architectural scope associated with Keating Hall Veterans Center Renovation as shown on plans filed herewith. No change of use, egress and occupancy.”
- Alteration, filed Jul 10, 2026, estimated cost $700K, described as “Installation of stormwater management system (subsurface infiltration tanks) per dep private property green infrastructure retrofit incentive program. No change to use, egress, or occupancy.”
- No Work, filed May 26, 2026, described as “Fordham University's Jubilee Weekend events in the tents on the lawn.”
- Alteration, filed May 22, 2026, described as “Facade Inspection”
- No Work, filed May 11, 2026, described as “Event in the lawns of Fordham University Campus.”
- Alteration, filed Feb 13, 2026, estimated cost $249K, described as “Installing new mechanical equipment, including but not limited to control valves and a hot water system btu meter at john mulcahy hall. No changeof use, egress or occupancy”
- Alteration, filed Feb 6, 2026, estimated cost $615K, described as “Civil work that includes flood mitigation for the existing parking, as shown on the drainage and stormwater plans. No change of use, egress or occupancy.”
- No Work, filed Oct 14, 2025, described as “Events for Fordham University inside the Campus. Homecoming and Presidents Ball.”
- Alteration, filed Sep 25, 2025, estimated cost $977K, described as “Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. No change of use, egress and…”
- Alteration, filed Sep 25, 2025, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 4, 2025, estimated cost $1.0M, described as “Removal and replacement of chiller and associated piping on part of cellar”
- No Work, filed May 27, 2025, described as “Dining events with entertainment in temporary tents, for Fordham University campus.”
- Alteration, filed May 19, 2025, estimated cost $15K, described as “Like kind replacement of roof top packaged system. There is no change in use, occupancy, or egress.”
- No Work, filed May 9, 2025, described as “Dining events with entertainment in temporary tents, for graduating students and family members at the Fordham University campus.”
- Alteration, filed Apr 29, 2025, estimated cost $1.0M, described as “The proposed renovation of the existing football locker room as shown on the plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Apr 22, 2025, described as “Outdoor concert in the Fordham University campus in the lawn.”
- Alteration, filed Mar 17, 2025, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 5, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 29, 2025, estimated cost $65K, described as “Structural repairs of existing slab at St John's as shown on plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Jan 16, 2025, described as “John Mulcany Hall - Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 18, 2024, estimated cost $110K, described as “Filing herewith for removal of temporary egress stair and installation of new curtain wall window as per plans.”
- Alteration, filed Dec 9, 2024, described as “Facade inspection”
- Alteration, filed Dec 9, 2024, described as “Facade inspection”

194 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/2032730001/441-east-fordham-road.

## Building history

- Alteration, filed Jun 28, 2019, permit issued - entire job/work, stories 3 to 4
- Alteration, filed Jun 14, 2019, signed off Dec 30, 2020, described as “Application is filed for interior renovation to change the use in the basement to establish the band room as shown on plans filed herewith.”
- Alteration, filed Jun 20, 2017, permit issued - entire job/work, described as “Proposed to account for minor exit changes for existing place of public assembly. Adequate, complying exits remain. # of occupants are not increased, as per plan filed herewith.”
- Alteration, filed Apr 7, 2017, permit issued - entire job/work, described as “Application is filed to revise certificate of occupancy and to convert offices to cafe on the 001 floor and for interior partition work.”
- Alteration, filed Mar 19, 2015, signed off Sep 9, 2015, described as “No work application is filed to correct the building number for o'hare hall from 451 (per existing certificate of occupancy # 200689834) to 671 e fordham rd and to change use and occupancy on the 1ST fl”
- Major Renovation — Conversion, filed Feb 6, 2014, signed off Nov 24, 2014, 54 units added, 7 stories, described as “Application is filed to correct the building number for loyola hall from 441 (per existing certificate of occupancy) to 479 e fordham rd and to change the use of the building to student dormitory.”
- Major Renovation — Conversion, filed Nov 6, 2013, signed off Jul 3, 2017, 37 units added, 7 stories, described as “Application is filed to correct the building number for faber hall from 441 (per existing certificate of occupancy #200356881) to 477 e fordham rd and to increase the number of people on the 1ST p; to establish the use and to conver t…”
- Alteration, filed Jun 26, 2012, permit issued - entire job/work, described as “Mcginley center - herewith filing for the modification of interior partitions for new fitness center as indicated on the attached plans.”
- New Building, filed Sep 7, 2011, signed off Aug 13, 2012, 2 stories, described as “Soft ball field with a grandstand, dugouts and press box.”
- Alteration, filed Apr 27, 2011, signed off Feb 14, 2014, units 75 to 0, described as “Filing herewith alteration type one application to change the use from student dormitory (j 2-1968 code) to use b business (adult education facility) (2008 code). New fire exit stairs, new interior partitions, new windows, new ceilings,…”

The 10 most recent of 27 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $262,696,950
- Market value (city estimate): $583,771,000
- Taxable value: $0
- Assessed land: $20,249,550
- Assessed improvements: $242,447,400

## Tax breaks

- Nonprofit exemption (college or university), with no end date, about $28,497,365 a year below the full tax.

## Zoning

R6: floor area ratio 0.65 built, 2.43 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of St. John's Residence Hall (Fordham University) (Individual Landmark). 34 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- FORDHAM UNIVERSITY PKG GARAGE (City Planning P2003X0279): Completed, decided Aug 25, 2003. REZONE C8-1 & R6 TO R6/C2-3 FOR A 150 PUBLIC PARKING IN\*EXECSS OF 150 SPACES