# 261 East 202nd Street, The Bronx

Apartment building · 163 units · built 2021 · Block 3308, Lot 92.

On Umarelli: https://umarelli.org/nyc/2033080092/261-east-202-street

More construction in Bedford Park and Norwood: https://umarelli.org/nyc/bronx/bedford-park-and-norwood.md

## Building permits

- Alteration, filed Aug 7, 2024, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed & pipe scaffold to comply with chapter 33 of NYC building code of…”
- Alteration, filed Sep 20, 2021, estimated cost $17K, described as “Installation of 6000 lb dual car personnel/material hoist as per plans during construction. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 1, 2021, estimated cost $20K, described as “Installation of 300PSF sidewalk shed, pipe scaffold, plywood fence, needle beams as per plans. All equipment shall comply with chapter #33 of the 2014 code. Sidewalk shed post installed on the roadway (dot by other). No change to use,…”
- Alteration, filed Aug 22, 2021, estimated cost $18K, described as “Installation of temporary horizontal netting as per plans. Horizontal netting shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Feb 6, 2020, estimated cost $1K, described as “Temporary Plywood Construction Fence”
- Alteration, filed Jan 16, 2020, estimated cost $1K, described as “Curb cut filing associated with the NB.”
- Alteration, filed Jan 16, 2020, estimated cost $1K, described as “Structural work in conjunction with NB #210179965.”
- Alteration, filed Dec 26, 2019, estimated cost $1K, described as “Temporary standpipe file associated with NB.”
- Alteration, filed Dec 26, 2019, estimated cost $1K, described as “Sprinkler/Standpipe file associated with NB.”
- Alteration, filed Oct 28, 2019, estimated cost $1K, described as “New Boiler installations in conjunction with NB 210179965”
- Alteration, filed Oct 23, 2019, estimated cost $1K, described as “New plumbing work filed in conjunction with NB #210179965”
- Alteration, filed Oct 22, 2019, estimated cost $1K, described as “New mechanical work filed in conjunction with NB #210179965. Installation of electric commercial cooking equipment at cellar.”
- Alteration, filed Jun 29, 2018, estimated cost $1K, described as “Installation of construction fence, to protect lots 93/92/90 during full demolition, under DM# 220648985/220613584/220612745/220613593. This project also includes the demolition in conjunction with 261 E 202 St FN app #X00017684, 263 E 202…”
- Alteration, filed May 15, 2018, estimated cost $2K, described as “Installation of construction fence to protect site under while performing demolition for house and garage, under permit #s220613584/220612745”
- Alteration, filed Mar 7, 2018, estimated cost $3K, described as “Installation of fence to protect construction site, for full demolition of house, under DM # 220613593”

## Property taxes

- Assessment: $10,708,650
- Market value (city estimate): $23,797,000
- Taxable value: $0
- Assessed land: $675,000
- Assessed improvements: $10,033,650

## Tax breaks

- 420-c exemption, through Jun 30, 2061, about $1,332,049 a year below the full tax.

## Zoning

R8: floor area ratio 6.75 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Dec 17, 2020: $7,591,084
- Aug 30, 2017: $800,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Work Wraps Up on 261 East 202nd Street and 270 East 203rd Street in Bedford Park, The Bronx](https://newyorkyimby.com/2026/01/work-wraps-up-on-261-east-202nd-street-and-270-east-203rd-street-in-bedford-park-the-bronx.html), New York YIMBY, Jan 31, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
