3424 Kossuth Avenue, The Bronx
Hospital · built 1972 · Block 3327, Lot 200.
Building permits
- Alteration, filed Jul 14, 2026, estimated cost $773K, described as “Demolition and removal of existing pressure reducing station on 5th floor mechanical room. Provide new pressure reducing station including all necessary valves, as well as new bacnet-based pressure reducing station controls.”
- Alteration, filed May 6, 2026, estimated cost $3.1M, described as “Interior removals of partitions, ceilings and finishes”
- Alteration, filed Feb 5, 2026, estimated cost $20K, described as “Equipment use: dual 7000 # capacity personnel hoist during bldg renovations, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately.”
- Alteration, filed Oct 8, 2024, estimated cost $10K, described as “Installation of pipe scaffold at 3424 kossuth avenue, bronx as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 1, 2024, estimated cost $865K, described as “Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13”
- Alteration, filed Sep 30, 2024, estimated cost $2.8M, described as “HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.”
- Alteration, filed Sep 24, 2024, estimated cost $3.8M, described as “Interior renovation on floors 1B , 3, 4, 6 & 13.”
- Alteration, filed Sep 24, 2024, estimated cost $190K, described as “Structural modification consisting of new core drill openings through existing slabs and infill of existing slab openings.”
- Alteration, filed May 23, 2024, estimated cost $5.2M, described as “Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)”
- Alteration, filed May 20, 2024, estimated cost $1.5M, described as “Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.”
- Alteration, filed Apr 29, 2024, estimated cost $1.5M, described as “Installation of new chimney liner in existing masonry chimney on floors basement 3 roof as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Jan 26, 2024, estimated cost $420K, described as “Installation of new emergency Generator and associated mechanical equipment as indicated on plans.”
- Alteration, filed Oct 23, 2023, estimated cost $2.0M, described as “Minor interior renovation throughout the building to support Emergency Generator Upgrades”
- Alteration, filed Oct 17, 2023, estimated cost $231K, described as “Modification of structural steel to support generator on 3rd floor roof.”
- Alteration, filed Aug 7, 2023, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 13, 2023, estimated cost $15K, described as “Installation of light duty side walk shed.as per plan.”
- Alteration, filed Apr 28, 2021, estimated cost $1.2M, described as “Filing to replace filters with enhanced electronic filtration technology, add bipolar ionization, provide UV lighting at cooling coils, and provide fan-HEPA filter modules in dental exam rooms as part of COVID Emergency Air Qualit…”
- Alteration, filed Apr 28, 2021, estimated cost $431K, described as “Filing to modify existing suspended ceiling system to accommodate above ceiling mounted HEPA filter unit and install new low return air duct. No change to use, egress or occupancy under this application.”
- No Work, filed Aug 11, 2020
- Alteration, filed Jul 15, 2020, estimated cost $280K, described as “Plumbing modification on part of 10th floor (dialysis boxes) as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Apr 30, 2020, estimated cost $375K, described as “Mechanical modification as shown on plans. There is no change in egress, use or occupancy.”
- Alteration, filed Apr 30, 2020, estimated cost $150K, described as “Modification of plumbing on part of the 1st floor”
- Alteration, filed Apr 28, 2020, estimated cost $639K, described as “Modification of plumbing on 6th & 10th floor as indicated on the attached plans. There is no change in egress, use, or occupancy.”
- Alteration, filed Apr 28, 2020, estimated cost $1.1M, described as “Mechanical modification on the 5th , 6th & 10th floor. There is no change in egress, use or occupancy.”
- Alteration, filed Apr 28, 2020, estimated cost $100K, described as “Modification of sprinkler work on part of the 1st floor.”
6 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $88,122,600
- Market value (city estimate)
- $195,828,000
- Taxable value
- $0
- Assessed land
- $884,250
- Assessed improvements
- $87,238,350
Zoning
R7-1: floor area ratio 2.80 built, 3.44 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Montefiore LSCF Minor Mod - Stair Project (City Planning P2015X0139): Completed, decided Aug 23, 2016. This is a private application by Montefiore Medical Center requesting an authorization pursuant to 79-21 and a minor modification to an existing Large-Scale Community Facility Development in order to construct a stairwell and elevator on…